[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-alcoutim-secures-eu-backing-for-4-85m-plan-to-link-villages":3},{"page":4,"entities":36,"events":37,"regions":38,"categories":68,"pulseDate":125,"topics":126,"related":135},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},2116,{"en":7,"pt":8},"alcoutim-secures-eu-backing-for-4-85m-plan-to-link-villages","alcoutim-garante-apoio-europeu-para-ligar-aldeias-a-rede",{"en":10,"pt":11},"Alcoutim secures EU backing for €4.85m plan to link villages to regional water network","Alcoutim garante apoio europeu para ligar aldeias à rede regional de água",{"en":13,"pt":14},"Alcoutim Council will spend €4.85 million modernising and extending its public water supply, with €2.99 million coming from the European Regional Development Fund under the Algarve 2030 programme. The project, approved on 29 October, is due to finish by the end of 2028. Four main pipelines will add 36.15 kilometres of network and merge 10 separate supply zones into one system tied to the Algarve's regional supply. That will allow several low-yield groundwater extraction points, some with water quality problems that carry public health implications, to be closed, easing pressure on local aquifers.","A Câmara de Alcoutim vai investir 4,85 milhões de euros na modernização e ampliação do abastecimento público de água, com 2,99 milhões provenientes do Fundo Europeu de Desenvolvimento Regional, ao abrigo do programa Algarve 2030. O projeto, aprovado a 29 de outubro, deverá estar concluído até ao final de 2028. Quatro condutas principais acrescentarão 36,15 quilómetros à rede e reunirão dez zonas de abastecimento num só sistema, ligado ao abastecimento regional do Algarve. Isso permitirá encerrar várias captações subterrâneas de baixa produtividade, algumas com problemas de qualidade da água e implicações para a saúde pública, aliviando a pressão sobre os aquíferos locais.",{"en":16,"pt":17},"Ten separate supply zones, from Tesouro to Barroso, are about to become one, and the groundwater wells that serve them may soon be shut.","Dez zonas de abastecimento, do Tesouro ao Barroso, vão passar a ser uma só, e as captações subterrâneas que hoje as servem podem fechar.","2026-11-23T00:00:00+00:00","2026-11-25T02:50:18.217055+00:00","algarve","energy_water_mobility",null,[24,28,33],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fwww.portugalresident.com\u002Falcoutim-to-invest-e4-85-million-in-water-supply-network","Portugal Resident",{"is_primary":29,"source_url":30,"source_name":31,"published_at":32},false,"https:\u002F\u002Fgreensavers.sapo.pt\u002Falcoutim-vai-investir-485-me-para-melhorar-abastecimento-publico-de-agua","Green Savers","2026-11-24T00:00:00+00:00",{"is_primary":29,"source_url":34,"source_name":35,"published_at":18},"https:\u002F\u002Fwww.barlavento.pt\u002Falcoutim-investimento-rede-abastecimento-agua","Barlavento",[],[],[39,43,47,52,56,59,64],{"code":40,"name":41},"norte",{"en":42,"pt":42},"Norte",{"code":44,"name":45},"centro",{"en":46,"pt":46},"Centro",{"code":48,"name":49},"lisboa",{"en":50,"pt":51},"Lisbon","Lisboa",{"code":53,"name":54},"alentejo",{"en":55,"pt":55},"Alentejo",{"code":20,"name":57},{"en":58,"pt":58},"Algarve",{"code":60,"name":61},"azores",{"en":62,"pt":63},"Azores","Açores",{"code":65,"name":66},"madeira",{"en":67,"pt":67},"Madeira",[69,76,83,90,97,104,111,118],{"slug":70,"name":73},{"en":71,"pt":72},"food-agriculture","alimentacao-e-agricultura",{"en":74,"pt":75},"Food & Agriculture","Alimentação e Agricultura",{"slug":77,"name":80},{"en":78,"pt":79},"construction-housing","construcao-e-habitacao",{"en":81,"pt":82},"Construction & Housing","Construção e Habitação",{"slug":84,"name":87},{"en":85,"pt":86},"health-wellbeing","saude-e-bem-estar",{"en":88,"pt":89},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":91,"name":94},{"en":92,"pt":93},"community-social-innovation","comunidade-e-inovacao-social",{"en":95,"pt":96},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":98,"name":101},{"en":99,"pt":100},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":102,"pt":103},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":105,"name":108},{"en":106,"pt":107},"energy-water-mobility","energia-agua-e-mobilidade",{"en":109,"pt":110},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":112,"name":115},{"en":113,"pt":114},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":116,"pt":117},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":119,"name":122},{"en":120,"pt":121},"education-eco-tourism","educacao-e-ecoturismo",{"en":123,"pt":124},"Education & Eco-tourism","Educação e Ecoturismo","2026-11-24",[127,131],{"name":128,"slug":130,"active":25},{"en":129,"pt":22},"water supply management","water-supply-management",{"name":132,"slug":134,"active":25},{"en":133,"pt":22},"water supply and distribution","water-supply-and-distribution",[136,148,160],{"id":137,"slug":138,"region":20,"teaser":141,"category":21,"headline":144,"source_published_at":147},1913,{"en":139,"pt":140},"portimao-begins-extending-mains-water-to-rural-montes-de","portimao-inicia-ligacao-dos-montes-de-cima-a-rede-publica-de",{"en":142,"pt":143},"A 150-day contract is expected to finish only in April 2027, and the new pipes will also serve fire crews.","Uma empreitada de 150 dias só deverá ficar concluída em abril de 2027, e as novas condutas servirão também os bombeiros.",{"en":145,"pt":146},"Portimão begins extending mains water to rural Montes de Cima","Portimão inicia ligação dos Montes de Cima à rede pública de água","2026-11-05T00:00:00+00:00",{"id":149,"slug":150,"region":20,"teaser":153,"category":21,"headline":156,"source_published_at":159},2177,{"en":151,"pt":152},"six-water-mains-burst-in-loule-in-one-day-mayor-blames","seis-ruturas-de-agua-num-so-dia-em-loule-presidente-aponta",{"en":154,"pt":155},"Pipes laid in the 1980s are only part of the story, and the mayor says the fix will take years, not months.","As tubagens dos anos 80 são apenas parte do problema, e o autarca admite que a solução vai demorar muitos anos.",{"en":157,"pt":158},"Six water mains burst in Loulé in one day; mayor blames decades of neglect","Seis ruturas de água num só dia em Loulé: presidente aponta décadas sem investimento","2026-11-26T00:00:00+00:00",{"id":161,"slug":162,"region":22,"teaser":165,"category":21,"headline":168,"source_published_at":171},1956,{"en":163,"pt":164},"former-water-institute-head-wants-water-sovereignty-debated","ex-presidente-do-instituto-nacional-da-agua-quer-soberania",{"en":166,"pt":167},"From data centres to hydrogen plants, new industries are putting fresh claims on a limited resource, and a question about who owns the capital behind dam concessions is now on the table.","Dos centros de dados às fábricas de hidrogénio, as novas indústrias disputam um recurso limitado, e pergunta-se agora de onde vem o capital por trás das concessões de barragens.",{"en":169,"pt":170},"Former water institute head wants water sovereignty debated at November conference","Ex-presidente do Instituto Nacional da Água quer soberania hídrica em debate em novembro","2026-11-11T00:00:00+00:00"]