[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-castro-marim-secures-full-eu-funding-for-hillside-water-supp":3},{"page":4,"entities":35,"events":36,"regions":37,"categories":67,"pulseDate":124,"topics":125,"related":134},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1440,{"en":7,"pt":8},"castro-marim-secures-full-eu-funding-for-hillside-water-supp","castro-marim-garante-financiamento-comunitario-total-para-ob",{"en":10,"pt":11},"Castro Marim secures full EU funding for hillside water supply works","Castro Marim garante financiamento comunitário total para obra de abastecimento de água na serra",{"en":13,"pt":14},"The Municipality of Castro Marim has signed a protocol with the Fundo Ambiental that raises EU funding for a water supply project in the local hills from 60% to 100%, freeing up municipal resources for other works. The project, already under way, will build a supply and distribution network serving Cortelha, Marroquil, Amendoeira, Beliche and Corte Gago, including a reservoir at Pero Vaz and a link to the central supply subsystem from Vale do Gato. The works form part of a wider municipal strategy to extend piped water to isolated hillside communities, following earlier extensions in Pisa Barro and in Azinhal and Odeleite parishes.","O Município de Castro Marim assinou um protocolo com o Fundo Ambiental que eleva o financiamento comunitário da obra de abastecimento de água na serra de 60% para 100%, libertando recursos municipais para outras intervenções. A empreitada, já em execução, vai construir uma rede de abastecimento e distribuição que serve Cortelha, Marroquil, Amendoeira, Beliche e Corte Gago, incluindo um depósito no Pero Vaz e uma ligação ao subsistema central a partir do Vale do Gato. A obra integra a estratégia municipal de extensão da rede pública de água a povoações isoladas da serra, depois de intervenções anteriores em Pisa Barro e nas freguesias de Azinhal e Odeleite.",{"en":16,"pt":17},"A protocol signed on 30 September turns a 60% EU grant into full funding for works already under way.","Um protocolo assinado a 30 de setembro transforma um apoio comunitário de 60% em financiamento total para uma obra já em curso.","2026-10-06T00:00:00+00:00","2026-10-07T02:56:12.468059+00:00","algarve","energy_water_mobility",null,[24,28,32],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fjornaldoalgarve.pt\u002Fobra-de-abastecimento-de-agua-a-serra-de-castro-marim-passa-a-ter-financiamento-a-100","Jornal do Algarve",{"is_primary":29,"source_url":30,"source_name":31,"published_at":18},false,"https:\u002F\u002Fpostal.pt\u002Falgarve\u002Fcastro-marim-garante-financiamento-total-para-levar-agua-a-cortelha-e-outras-povoacoes","Postal",{"is_primary":29,"source_url":33,"source_name":34,"published_at":18},"https:\u002F\u002Fwww.barlavento.pt\u002Fcastro-marim-agua-cortelha-financiamento","Barlavento",[],[],[38,42,46,51,55,58,63],{"code":39,"name":40},"norte",{"en":41,"pt":41},"Norte",{"code":43,"name":44},"centro",{"en":45,"pt":45},"Centro",{"code":47,"name":48},"lisboa",{"en":49,"pt":50},"Lisbon","Lisboa",{"code":52,"name":53},"alentejo",{"en":54,"pt":54},"Alentejo",{"code":20,"name":56},{"en":57,"pt":57},"Algarve",{"code":59,"name":60},"azores",{"en":61,"pt":62},"Azores","Açores",{"code":64,"name":65},"madeira",{"en":66,"pt":66},"Madeira",[68,75,82,89,96,103,110,117],{"slug":69,"name":72},{"en":70,"pt":71},"food-agriculture","alimentacao-e-agricultura",{"en":73,"pt":74},"Food & Agriculture","Alimentação e Agricultura",{"slug":76,"name":79},{"en":77,"pt":78},"construction-housing","construcao-e-habitacao",{"en":80,"pt":81},"Construction & Housing","Construção e Habitação",{"slug":83,"name":86},{"en":84,"pt":85},"health-wellbeing","saude-e-bem-estar",{"en":87,"pt":88},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":90,"name":93},{"en":91,"pt":92},"community-social-innovation","comunidade-e-inovacao-social",{"en":94,"pt":95},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":97,"name":100},{"en":98,"pt":99},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":101,"pt":102},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":104,"name":107},{"en":105,"pt":106},"energy-water-mobility","energia-agua-e-mobilidade",{"en":108,"pt":109},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":111,"name":114},{"en":112,"pt":113},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":115,"pt":116},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":118,"name":121},{"en":119,"pt":120},"education-eco-tourism","educacao-e-ecoturismo",{"en":122,"pt":123},"Education & Eco-tourism","Educação e Ecoturismo","2026-10-07",[126,130],{"name":127,"slug":129,"active":25},{"en":128,"pt":22},"water supply and distribution","water-supply-and-distribution",{"name":131,"slug":133,"active":25},{"en":132,"pt":22},"water access and quality","water-access-and-quality",[135,147,159],{"id":136,"slug":137,"region":20,"teaser":140,"category":21,"headline":143,"source_published_at":146},1913,{"en":138,"pt":139},"portimao-begins-extending-mains-water-to-rural-montes-de","portimao-inicia-ligacao-dos-montes-de-cima-a-rede-publica-de",{"en":141,"pt":142},"A 150-day contract is expected to finish only in April 2027, and the new pipes will also serve fire crews.","Uma empreitada de 150 dias só deverá ficar concluída em abril de 2027, e as novas condutas servirão também os bombeiros.",{"en":144,"pt":145},"Portimão begins extending mains water to rural Montes de Cima","Portimão inicia ligação dos Montes de Cima à rede pública de água","2026-11-05T00:00:00+00:00",{"id":148,"slug":149,"region":47,"teaser":152,"category":21,"headline":155,"source_published_at":158},1246,{"en":150,"pt":151},"quercus-opposes-biomethane-plant-planned-for-alenquer-2","quercus-da-parecer-desfavoravel-a-unidade-de-biometano-em-al-2",{"en":153,"pt":154},"A conservation group flags contamination risks and unresolved questions about where tonnes of by-product waste would actually go.","Associação ambientalista aponta riscos de contaminação e falta de resposta sobre o destino de milhares de toneladas de resíduos.",{"en":156,"pt":157},"Quercus opposes biomethane plant planned for Alenquer","Quercus dá parecer desfavorável a unidade de biometano em Alenquer","2026-09-16T00:00:00+00:00",{"id":160,"slug":161,"region":43,"teaser":164,"category":21,"headline":167,"source_published_at":170},1266,{"en":162,"pt":163},"leiria-water-utility-completes-1-6m-pipeline-linking-coimbra-3","smas-de-leiria-concluem-conduta-de-1-6-milhoes-de-euros-na-f-3",{"en":165,"pt":166},"A new 12.8km pipeline in Leiria replaces a system that relied on three separate water sources.","Uma nova conduta de 12,8 km em Leiria vem substituir um sistema que dependia de três captações distintas.",{"en":168,"pt":169},"Leiria water utility completes €1.6m pipeline linking Coimbrão reservoirs","SMAS de Leiria concluem conduta de 1,6 milhões de euros na freguesia do Coimbrão","2026-09-03T00:00:00+00:00"]