[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-leiria-water-utility-completes-1-6m-pipeline-linking-coimbra-3":3},{"page":4,"entities":33,"events":34,"regions":35,"categories":65,"pulseDate":122,"topics":123,"related":128},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1266,{"en":7,"pt":8},"leiria-water-utility-completes-1-6m-pipeline-linking-coimbra-3","smas-de-leiria-concluem-conduta-de-1-6-milhoes-de-euros-na-f-3",{"en":10,"pt":11},"Leiria water utility completes €1.6m pipeline linking Coimbrão reservoirs","SMAS de Leiria concluem conduta de 1,6 milhões de euros na freguesia do Coimbrão",{"en":13,"pt":14},"The Leiria municipal water services (SMAS) have finished building a new 12.8km water pipeline connecting the Monte Redondo, Praia do Pedrógão and Ervideira reservoirs, at a cost of around €1.6 million. The project replaces reliance on three separate water sources and strengthens supply to the Coimbrão parish. Works also included refurbishing the three reservoirs, building new control chambers, installing flow meters, emergency generators and upgraded remote-management systems. After cleaning, disinfection and quality testing between 24 August and 2 September, the system began operating on Thursday, 3 September.","Os SMAS de Leiria concluíram a construção de uma nova conduta adutora com 12,8 km, que liga os reservatórios de Monte Redondo, Praia do Pedrógão e Ervideira, num investimento de cerca de 1,6 milhões de euros. A obra substitui a dependência de três captações distintas e reforça o abastecimento de água à freguesia do Coimbrão. Os trabalhos incluíram ainda a reabilitação dos três reservatórios, a construção de novas câmaras de manobra e a instalação de medidores de caudal, geradores de emergência e sistemas de telegestão modernizados. Após limpeza, desinfeção e análises de qualidade entre 24 de agosto e 2 de setembro, o sistema entrou em funcionamento na quinta-feira, dia 3 de setembro.",{"en":16,"pt":17},"A new 12.8km pipeline in Leiria replaces a system that relied on three separate water sources.","Uma nova conduta de 12,8 km em Leiria vem substituir um sistema que dependia de três captações distintas.","2026-09-03T00:00:00+00:00","2026-09-23T19:10:12.432545+00:00","centro","energy_water_mobility",null,[24,28],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fwww.ambientemagazine.com\u002Fsmas-de-leiria-investem-16me-no-reforco-do-abastecimento-de-agua-a-freguesia-do-coimbrao","Ambiente Magazine",{"is_primary":29,"source_url":30,"source_name":31,"published_at":32},false,"https:\u002F\u002Fwww.jornaldeleiria.pt\u002Fnoticia\u002Fobras-de-17-milhoes-de-euros-reforcam-abastecimento-de-agua-a-praia-do-pedrogao","Jornal de Leiria","2026-09-05T00:00:00+00:00",[],[],[36,40,43,48,52,56,61],{"code":37,"name":38},"norte",{"en":39,"pt":39},"Norte",{"code":20,"name":41},{"en":42,"pt":42},"Centro",{"code":44,"name":45},"lisboa",{"en":46,"pt":47},"Lisbon","Lisboa",{"code":49,"name":50},"alentejo",{"en":51,"pt":51},"Alentejo",{"code":53,"name":54},"algarve",{"en":55,"pt":55},"Algarve",{"code":57,"name":58},"azores",{"en":59,"pt":60},"Azores","Açores",{"code":62,"name":63},"madeira",{"en":64,"pt":64},"Madeira",[66,73,80,87,94,101,108,115],{"slug":67,"name":70},{"en":68,"pt":69},"food-agriculture","alimentacao-e-agricultura",{"en":71,"pt":72},"Food & Agriculture","Alimentação e Agricultura",{"slug":74,"name":77},{"en":75,"pt":76},"construction-housing","construcao-e-habitacao",{"en":78,"pt":79},"Construction & Housing","Construção e Habitação",{"slug":81,"name":84},{"en":82,"pt":83},"health-wellbeing","saude-e-bem-estar",{"en":85,"pt":86},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":88,"name":91},{"en":89,"pt":90},"community-social-innovation","comunidade-e-inovacao-social",{"en":92,"pt":93},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":95,"name":98},{"en":96,"pt":97},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":99,"pt":100},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":102,"name":105},{"en":103,"pt":104},"energy-water-mobility","energia-agua-e-mobilidade",{"en":106,"pt":107},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":109,"name":112},{"en":110,"pt":111},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":113,"pt":114},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":116,"name":119},{"en":117,"pt":118},"education-eco-tourism","educacao-e-ecoturismo",{"en":120,"pt":121},"Education & Eco-tourism","Educação e Ecoturismo","2026-09-04",[124],{"name":125,"slug":127,"active":25},{"en":126,"pt":22},"water supply and distribution","water-supply-and-distribution",[129,141,153],{"id":130,"slug":131,"region":53,"teaser":134,"category":21,"headline":137,"source_published_at":140},1440,{"en":132,"pt":133},"castro-marim-secures-full-eu-funding-for-hillside-water-supp","castro-marim-garante-financiamento-comunitario-total-para-ob",{"en":135,"pt":136},"A protocol signed on 30 September turns a 60% EU grant into full funding for works already under way.","Um protocolo assinado a 30 de setembro transforma um apoio comunitário de 60% em financiamento total para uma obra já em curso.",{"en":138,"pt":139},"Castro Marim secures full EU funding for hillside water supply works","Castro Marim garante financiamento comunitário total para obra de abastecimento de água na serra","2026-10-06T00:00:00+00:00",{"id":142,"slug":143,"region":37,"teaser":146,"category":21,"headline":149,"source_published_at":152},569,{"en":144,"pt":145},"porto-water-utility-ranked-best-in-portugal-for-third-year","aguas-e-energia-do-porto-lidera-qualidade-da-agua-pelo-terce",{"en":147,"pt":148},"A Porto municipal utility has topped a national water quality ranking for three years running, with a fresh 8.2 million euro plan ahead.","Empresa municipal do Porto mantém a liderança nacional há três anos, com novo plano de investimento de 8,2 milhões de euros à vista.",{"en":150,"pt":151},"Porto water utility ranked best in Portugal for third year","Águas e Energia do Porto lidera qualidade da água pelo terceiro ano","2026-08-06T00:00:00+00:00",{"id":154,"slug":155,"region":53,"teaser":158,"category":21,"headline":161,"source_published_at":164},2116,{"en":156,"pt":157},"alcoutim-secures-eu-backing-for-4-85m-plan-to-link-villages","alcoutim-garante-apoio-europeu-para-ligar-aldeias-a-rede",{"en":159,"pt":160},"Ten separate supply zones, from Tesouro to Barroso, are about to become one, and the groundwater wells that serve them may soon be shut.","Dez zonas de abastecimento, do Tesouro ao Barroso, vão passar a ser uma só, e as captações subterrâneas que hoje as servem podem fechar.",{"en":162,"pt":163},"Alcoutim secures EU backing for €4.85m plan to link villages to regional water network","Alcoutim garante apoio europeu para ligar aldeias à rede regional de água","2026-11-23T00:00:00+00:00"]