[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-new-irrigation-network-for-xevora-inaugurated-in-campo-maior":3},{"page":4,"entities":39,"events":40,"regions":41,"categories":71,"pulseDate":128,"topics":129,"related":138},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1171,{"en":7,"pt":8},"new-irrigation-network-for-xevora-inaugurated-in-campo-maior","nova-rede-de-rega-do-xevora-inaugurada-em-campo-maior",{"en":10,"pt":11},"New irrigation network for Xévora inaugurated in Campo Maior","Nova rede de rega do Xévora inaugurada em Campo Maior",{"en":13,"pt":14},"Portugal's DGADR inaugurated the irrigation network of the Xévora hydro-agricultural scheme in Campo Maior on 21 July, serving 1,560 hectares within an overall investment of about €25 million. The completed works, costing nearly €19 million and financed by the PDR 2020 rural development programme, include roughly 44km of pipes, 70 hydrants and 106 water outlets, fed by the Abrilongo dam. Officials including Agriculture Minister José Manuel Fernandes attended. A pumping station and environmental compensation measures are still planned, with the network expected to improve water management and support crop diversification for local farmers.","A DGADR inaugurou, a 21 de julho, em Campo Maior, a rede de rega do Aproveitamento Hidroagrícola do Xévora, que servirá 1.560 hectares num investimento global de cerca de 25 milhões de euros. A empreitada agora concluída, com custo próximo dos 19 milhões de euros e financiada pelo PDR 2020, inclui cerca de 44 quilómetros de condutas, 70 hidrantes e 106 bocas de rega, abastecidos pela barragem do Abrilongo. A cerimónia contou com o Ministro da Agricultura e Mar, José Manuel Fernandes, entre outras entidades. Falta ainda construir a estação elevatória e concretizar as medidas de compensação ambiental, esperando-se que a rede traga maior previsibilidade na gestão da água e diversificação das culturas.",{"en":16,"pt":17},"A long-awaited water network went live in Campo Maior, fed by a dam completed 25 years ago.","Uma rede de rega há muito esperada entrou em funcionamento em Campo Maior, alimentada por uma barragem concluída há 25 anos.","2026-07-22T00:00:00+00:00","2026-09-23T17:09:20.30122+00:00","alentejo","food_agriculture",null,[24,28,33,35],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fwww.agroportal.pt\u002Fdgadr-concretiza-rede-de-rega-do-xevora","Agroportal",{"is_primary":29,"source_url":30,"source_name":31,"published_at":32},false,"https:\u002F\u002Fgreensavers.sapo.pt\u002Frede-de-rega-em-campo-maior-inaugurada-terca-feira-apos-investimento-de-189-me","Green Savers","2026-07-20T00:00:00+00:00",{"is_primary":29,"source_url":34,"source_name":27,"published_at":32},"https:\u002F\u002Fwww.agroportal.pt\u002Fda-pegada-de-carbono-a-biodiversidade-a-estrategia-que-quer-transformar-a-producao-de-pequenos-frutos",{"is_primary":29,"source_url":36,"source_name":37,"published_at":38},"https:\u002F\u002Fwww.portugalresident.com\u002Fportugal-inaugurates-e25-million-xevora-irrigation-project-to-boost-alentejo-agriculture","Portugal Resident","2026-07-21T00:00:00+00:00",[],[],[42,46,50,55,58,62,67],{"code":43,"name":44},"norte",{"en":45,"pt":45},"Norte",{"code":47,"name":48},"centro",{"en":49,"pt":49},"Centro",{"code":51,"name":52},"lisboa",{"en":53,"pt":54},"Lisbon","Lisboa",{"code":20,"name":56},{"en":57,"pt":57},"Alentejo",{"code":59,"name":60},"algarve",{"en":61,"pt":61},"Algarve",{"code":63,"name":64},"azores",{"en":65,"pt":66},"Azores","Açores",{"code":68,"name":69},"madeira",{"en":70,"pt":70},"Madeira",[72,79,86,93,100,107,114,121],{"slug":73,"name":76},{"en":74,"pt":75},"food-agriculture","alimentacao-e-agricultura",{"en":77,"pt":78},"Food & Agriculture","Alimentação e Agricultura",{"slug":80,"name":83},{"en":81,"pt":82},"construction-housing","construcao-e-habitacao",{"en":84,"pt":85},"Construction & Housing","Construção e Habitação",{"slug":87,"name":90},{"en":88,"pt":89},"health-wellbeing","saude-e-bem-estar",{"en":91,"pt":92},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":94,"name":97},{"en":95,"pt":96},"community-social-innovation","comunidade-e-inovacao-social",{"en":98,"pt":99},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":101,"name":104},{"en":102,"pt":103},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":105,"pt":106},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":108,"name":111},{"en":109,"pt":110},"energy-water-mobility","energia-agua-e-mobilidade",{"en":112,"pt":113},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":115,"name":118},{"en":116,"pt":117},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":119,"pt":120},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":122,"name":125},{"en":123,"pt":124},"education-eco-tourism","educacao-e-ecoturismo",{"en":126,"pt":127},"Education & Eco-tourism","Educação e Ecoturismo","2026-07-21",[130,134],{"name":131,"slug":133,"active":25},{"en":132,"pt":22},"irrigation efficiency","irrigation-efficiency",{"name":135,"slug":137,"active":25},{"en":136,"pt":22},"water scarcity","water-scarcity",[139,152,164],{"id":140,"slug":141,"region":47,"teaser":144,"category":147,"headline":148,"source_published_at":151},1309,{"en":142,"pt":143},"river-group-calls-for-freeze-on-new-tejo-dams-and-weirs-2","movimento-pede-suspensao-de-novas-barragens-e-acudes-no-tejo-2",{"en":145,"pt":146},"A river conservation group wants dozens of dam and weir projects on Portugal's Tejo frozen over one shared problem.","Um movimento pela defesa do Tejo quer travar dezenas de barragens e açudes por causa de um problema comum a quase todos.","ecosystems_biodiversity",{"en":149,"pt":150},"River group calls for freeze on new Tejo dams and weirs","Movimento pede suspensão de novas barragens e açudes no Tejo","2026-09-18T00:00:00+00:00",{"id":153,"slug":154,"region":20,"teaser":157,"category":21,"headline":160,"source_published_at":163},556,{"en":155,"pt":156},"tangerine-plantation-approved-in-protected-alentejo-wetland","plantacao-de-tangerineiras-aprovada-em-zona-protegida-do-ale",{"en":158,"pt":159},"After three rejections, an avocado-turned-tangerine project won approval despite 384 of 387 public objections.","Depois de três recusas, um projeto que passou de abacates a tangerinas foi aprovado apesar de 384 das 387 participações públicas contra.",{"en":161,"pt":162},"Tangerine plantation approved in protected Alentejo wetland after four attempts","Plantação de tangerineiras aprovada em zona protegida do Alentejo à quarta tentativa","2026-08-12T00:00:00+00:00",{"id":165,"slug":166,"region":59,"teaser":169,"category":147,"headline":172,"source_published_at":175},1545,{"en":167,"pt":168},"algarve-conservation-group-files-formal-objection-to-90m-fou","almargem-entrega-parecer-negativo-ao-projeto-de-90-milhoes-p",{"en":170,"pt":171},"Two-thirds of the fish in this southern stream are native, and the association says a concrete wall would put one species at risk of local extinction.","Dois terços dos peixes desta ribeira do Sul são nativos, e a associação teme que uma parede de betão leve uma espécie à extinção local.",{"en":173,"pt":174},"Algarve conservation group files formal objection to €90m Foupana dam","Almargem entrega parecer negativo ao projeto de 90 milhões para a Barragem da Foupana","2026-10-13T00:00:00+00:00"]