[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-portugal-gets-its-first-megawatt-truck-charger-at-new-lisbon":3},{"page":4,"entities":33,"events":34,"regions":35,"categories":65,"pulseDate":122,"topics":123,"related":132},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},2056,{"en":7,"pt":8},"portugal-gets-its-first-megawatt-truck-charger-at-new-lisbon","hub-junto-a-lisboa-estreia-o-primeiro-carregador-de-camioes",{"en":10,"pt":11},"Portugal gets its first megawatt truck charger at new Lisbon-area hub","Hub junto a Lisboa estreia o primeiro carregador de camiões de um megawatt do país",{"en":13,"pt":14},"Iberdrola | bp pulse has opened a 21-point ultra-fast charging hub at Lisboa Park, a logistics platform in Castanheira do Ribatejo, Vila Franca de Xira. Seven points serve heavy vehicles, including Portugal's first MCS charger, rated up to 1,000 kW; the other six deliver up to 600 kW. Fourteen points serve cars. The 4.45 MW site runs on renewable power and sits where the A1 and A10 motorways meet, in an area holding most of the national logistics stock. Builders raised the ground by about four metres to guard against flooding. The company aims for roughly 2,000 charge points in Portugal, up from over 600.","A Iberdrola | bp pulse inaugurou, na Plataforma Logística de Lisboa Norte, em Castanheira do Ribatejo (Vila Franca de Xira), um hub ultrarrápido com 21 pontos de carregamento. Sete destinam-se a pesados, incluindo o primeiro carregador MCS do país, com até 1.000 kW; os outros seis chegam aos 600 kW. Os restantes 14 servem ligeiros. A instalação tem 4,45 MW de potência, usa energia 100% renovável e situa-se no cruzamento da A1 com a A10, numa zona que concentra a maior parte do parque logístico nacional. O terreno foi elevado cerca de quatro metros para prevenir inundações. A empresa quer chegar a cerca de 2.000 pontos em Portugal, face aos mais de 600 atuais.",{"en":16,"pt":17},"A raised platform four metres above its old ground level hides a charger that can restore hundreds of kilometres of range during a single driver break.","O terreno subiu quatro metros para receber um carregador capaz de devolver centenas de quilómetros de autonomia durante uma única pausa obrigatória do condutor.","2026-11-19T00:00:00+00:00","2026-11-20T02:46:24.502409+00:00","lisboa","energy_water_mobility",null,[24,28],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fwww.ambientemagazine.com\u002Fiberdrola-bp-pulse-inaugura-centro-de-carregamento-ultrarrapido-com-o-primeiro-carregador-mcs-para-veiculos-pesados-em-portugal","Ambiente Magazine",{"is_primary":29,"source_url":30,"source_name":31,"published_at":32},false,"https:\u002F\u002Fgreensavers.sapo.pt\u002Fportugal-recebe-primeiro-carregador-de-um-megawatt-para-camioes-eletricos","Green Savers","2026-11-17T00:00:00+00:00",[],[],[36,40,44,48,52,56,61],{"code":37,"name":38},"norte",{"en":39,"pt":39},"Norte",{"code":41,"name":42},"centro",{"en":43,"pt":43},"Centro",{"code":20,"name":45},{"en":46,"pt":47},"Lisbon","Lisboa",{"code":49,"name":50},"alentejo",{"en":51,"pt":51},"Alentejo",{"code":53,"name":54},"algarve",{"en":55,"pt":55},"Algarve",{"code":57,"name":58},"azores",{"en":59,"pt":60},"Azores","Açores",{"code":62,"name":63},"madeira",{"en":64,"pt":64},"Madeira",[66,73,80,87,94,101,108,115],{"slug":67,"name":70},{"en":68,"pt":69},"food-agriculture","alimentacao-e-agricultura",{"en":71,"pt":72},"Food & Agriculture","Alimentação e Agricultura",{"slug":74,"name":77},{"en":75,"pt":76},"construction-housing","construcao-e-habitacao",{"en":78,"pt":79},"Construction & Housing","Construção e Habitação",{"slug":81,"name":84},{"en":82,"pt":83},"health-wellbeing","saude-e-bem-estar",{"en":85,"pt":86},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":88,"name":91},{"en":89,"pt":90},"community-social-innovation","comunidade-e-inovacao-social",{"en":92,"pt":93},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":95,"name":98},{"en":96,"pt":97},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":99,"pt":100},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":102,"name":105},{"en":103,"pt":104},"energy-water-mobility","energia-agua-e-mobilidade",{"en":106,"pt":107},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":109,"name":112},{"en":110,"pt":111},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":113,"pt":114},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":116,"name":119},{"en":117,"pt":118},"education-eco-tourism","educacao-e-ecoturismo",{"en":120,"pt":121},"Education & Eco-tourism","Educação e Ecoturismo","2026-11-18",[124,128],{"name":125,"slug":127,"active":25},{"en":126,"pt":22},"electric vehicle charging","electric-vehicle-charging",{"name":129,"slug":131,"active":25},{"en":130,"pt":22},"public rail transport","public-rail-transport",[133,145,157],{"id":134,"slug":135,"region":22,"teaser":138,"category":21,"headline":141,"source_published_at":144},1640,{"en":136,"pt":137},"mobi-e-prepares-voluntary-mobi-hub-platform-to-keep-ev-charg","mobi-e-prepara-plataforma-mobi-hub-para-manter-redes-de-carr",{"en":139,"pt":140},"The company that built Portugal's seamless charging experience is about to lose its monopoly on it, yet says it expects operators to keep coming anyway.","A empresa que criou a experiência de carregamento integrada em Portugal vai perder o monopólio dessa ligação, mas conta que os operadores continuem a bater-lhe à porta.",{"en":142,"pt":143},"MOBI.E prepares voluntary Mobi.Hub platform to keep EV charging networks linked after 2028","MOBI.E prepara plataforma Mobi.Hub para manter redes de carregamento ligadas depois de 2028","2026-10-22T00:00:00+00:00",{"id":146,"slug":147,"region":37,"teaser":150,"category":21,"headline":153,"source_published_at":156},946,{"en":148,"pt":149},"stcp-adds-30-electric-buses-fleet-reaches-126-7","stcp-soma-30-autocarros-eletricos-e-frota-chega-aos-126-7",{"en":151,"pt":152},"A €12 million fleet upgrade pushes nearly a third of Porto's bus network towards zero emissions.","Um investimento de 12 milhões de euros aproxima a rede de autocarros do Porto de quase um terço sem emissões.",{"en":154,"pt":155},"STCP adds 30 electric buses, fleet reaches 126","STCP soma 30 autocarros elétricos e frota chega aos 126","2026-09-17T00:00:00+00:00",{"id":158,"slug":159,"region":41,"teaser":162,"category":21,"headline":165,"source_published_at":168},2193,{"en":160,"pt":161},"leiria-region-demands-inclusion-in-126m-electric-public","regiao-de-leiria-exige-entrar-no-fundo-de-126-milhoes-para",{"en":163,"pt":164},"Seven of the region's ten municipalities count as low-density, yet the call that was meant to serve such areas still passed Leiria by.","Sete dos dez municípios da região são de baixa densidade, mas o aviso pensado para territórios assim deixou Leiria de fora.",{"en":166,"pt":167},"Leiria region demands inclusion in €126m electric public transport funding after being excluded","Região de Leiria exige entrar no fundo de 126 milhões para autocarros elétricos","2026-11-25T00:00:00+00:00"]