[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-portugal-s-public-ev-charging-network-passes-one-million-cha":3},{"page":4,"entities":35,"events":36,"regions":37,"categories":68,"pulseDate":125,"topics":126,"related":131},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":20,"news_page_sources":22},1524,{"en":7,"pt":8},"portugal-s-public-ev-charging-network-passes-one-million-cha","rede-publica-de-carregamento-eletrico-ultrapassa-um-milhao-d",{"en":10,"pt":11},"Portugal's public EV charging network passes one million charging sessions in a single month","Rede pública de carregamento elétrico ultrapassa um milhão de carregamentos num só mês",{"en":13,"pt":14},"Portugal's public charging network linked to MOBI.E recorded more than one million charging sessions in September, 33% up on a year earlier. Energy delivered topped 24,000 MWh, a 40% rise, while distinct users passed 250,000, up 91%. The network ended the month with 8,374 charging stations and about 16,300 charging points, and over 3,300 stations, roughly 40%, offered fast or ultra-fast charging. MOBI.E estimates the month's sessions avoided more than 19,000 tonnes of CO₂, and over 160,000 tonnes from January to September.","A rede pública de carregamento ligada à MOBI.E registou em setembro mais de um milhão de carregamentos, um aumento de 33% face ao mesmo mês de 2025. A energia fornecida superou os 24 mil MWh, mais 40%, e os utilizadores distintos ultrapassaram os 250 mil, mais 91%. No final do mês, a rede somava 8.374 postos e cerca de 16.300 pontos de carregamento, com mais de 3.300 postos, perto de 40%, de carregamento rápido ou ultrarrápido. Segundo a MOBI.E, os carregamentos do mês evitaram mais de 19 mil toneladas de CO₂ e, entre janeiro e setembro, mais de 160 mil.",{"en":16,"pt":17},"Users of the network almost doubled in a year, and the emissions saved are being measured in urban trees.","O número de utilizadores quase duplicou num ano, e as emissões evitadas já se medem em árvores urbanas.","2026-10-13T00:00:00+00:00","2026-10-15T04:29:24.131482+00:00",null,"energy_water_mobility",[23,27,31],{"is_primary":24,"source_url":25,"source_name":26,"published_at":18},true,"https:\u002F\u002Fjornalptgreen.pt\u002Fnoticia\u002Fcarregamentos-na-rede-mobi-e-crescem-33-em-termos-homologos","Jornal PT Green",{"is_primary":28,"source_url":29,"source_name":30,"published_at":18},false,"https:\u002F\u002Fgreensavers.sapo.pt\u002Frede-mobi-e-ultrapassa-um-milhao-de-carregamentos-num-unico-mes-mais-33-do-que-em-2025","Green Savers",{"is_primary":28,"source_url":32,"source_name":33,"published_at":34},"https:\u002F\u002Fwww.ambientemagazine.com\u002Fcarregamentos-eletricos-na-rede-mobi-e-crescem-33-e-ultrapassam-um-milhao-em-setembro","Ambiente Magazine","2026-10-14T00:00:00+00:00",[],[],[38,42,46,51,55,59,64],{"code":39,"name":40},"norte",{"en":41,"pt":41},"Norte",{"code":43,"name":44},"centro",{"en":45,"pt":45},"Centro",{"code":47,"name":48},"lisboa",{"en":49,"pt":50},"Lisbon","Lisboa",{"code":52,"name":53},"alentejo",{"en":54,"pt":54},"Alentejo",{"code":56,"name":57},"algarve",{"en":58,"pt":58},"Algarve",{"code":60,"name":61},"azores",{"en":62,"pt":63},"Azores","Açores",{"code":65,"name":66},"madeira",{"en":67,"pt":67},"Madeira",[69,76,83,90,97,104,111,118],{"slug":70,"name":73},{"en":71,"pt":72},"food-agriculture","alimentacao-e-agricultura",{"en":74,"pt":75},"Food & Agriculture","Alimentação e Agricultura",{"slug":77,"name":80},{"en":78,"pt":79},"construction-housing","construcao-e-habitacao",{"en":81,"pt":82},"Construction & Housing","Construção e Habitação",{"slug":84,"name":87},{"en":85,"pt":86},"health-wellbeing","saude-e-bem-estar",{"en":88,"pt":89},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":91,"name":94},{"en":92,"pt":93},"community-social-innovation","comunidade-e-inovacao-social",{"en":95,"pt":96},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":98,"name":101},{"en":99,"pt":100},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":102,"pt":103},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":105,"name":108},{"en":106,"pt":107},"energy-water-mobility","energia-agua-e-mobilidade",{"en":109,"pt":110},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":112,"name":115},{"en":113,"pt":114},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":116,"pt":117},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":119,"name":122},{"en":120,"pt":121},"education-eco-tourism","educacao-e-ecoturismo",{"en":123,"pt":124},"Education & Eco-tourism","Educação e Ecoturismo","2026-10-14",[127],{"name":128,"slug":130,"active":24},{"en":129,"pt":20},"electric vehicle charging","electric-vehicle-charging",[132,144,156],{"id":133,"slug":134,"region":47,"teaser":137,"category":21,"headline":140,"source_published_at":143},2056,{"en":135,"pt":136},"portugal-gets-its-first-megawatt-truck-charger-at-new-lisbon","hub-junto-a-lisboa-estreia-o-primeiro-carregador-de-camioes",{"en":138,"pt":139},"A raised platform four metres above its old ground level hides a charger that can restore hundreds of kilometres of range during a single driver break.","O terreno subiu quatro metros para receber um carregador capaz de devolver centenas de quilómetros de autonomia durante uma única pausa obrigatória do condutor.",{"en":141,"pt":142},"Portugal gets its first megawatt truck charger at new Lisbon-area hub","Hub junto a Lisboa estreia o primeiro carregador de camiões de um megawatt do país","2026-11-19T00:00:00+00:00",{"id":145,"slug":146,"region":56,"teaser":149,"category":21,"headline":152,"source_published_at":155},1987,{"en":147,"pt":148},"remo-expands-forum-algarve-charging-hub-in-faro-to-26-spaces","remo-alarga-para-26-lugares-o-hub-de-carregamento-do-forum",{"en":150,"pt":151},"Twelve of the new bays can deliver 300 kW, and drivers can pay by bank card without signing up to anything.","Doze dos novos lugares chegam aos 300 kW e basta um cartão bancário para pagar, sem registo prévio em qualquer plataforma.",{"en":153,"pt":154},"REMO expands Forum Algarve charging hub in Faro to 26 spaces","REMO alarga para 26 lugares o hub de carregamento do Forum Algarve, em Faro","2026-11-16T00:00:00+00:00",{"id":157,"slug":158,"region":20,"teaser":161,"category":21,"headline":164,"source_published_at":167},1741,{"en":159,"pt":160},"government-to-subsidise-up-to-80-of-electric-car-purchases-f","governo-vai-comparticipar-ate-80-da-compra-de-carros-eletric",{"en":162,"pt":163},"More than 20,000 cars are in line for the targeted scheme, while a separate 50 million euro pot stays open to everyone else.","Mais de 20 mil carros estão previstos neste apoio dirigido, enquanto uma dotação própria de 50 milhões de euros continua aberta ao resto da população.",{"en":165,"pt":166},"Government to subsidise up to 80% of electric car purchases for low-income households","Governo vai comparticipar até 80% da compra de carros elétricos por famílias carenciadas","2026-10-28T00:00:00+00:00"]