[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-six-swimmers-to-attempt-20km-sea-route-to-viana-wind-farm":3},{"page":4,"entities":28,"events":29,"regions":46,"categories":76,"pulseDate":133,"topics":134,"related":139},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},713,{"en":7,"pt":8},"six-swimmers-to-attempt-20km-sea-route-to-viana-wind-farm","seis-nadadores-vao-percorrer-20-km-ate-parque-eolico-de-vian",{"en":10,"pt":11},"Six swimmers to attempt 20km sea route to Viana wind farm","Seis nadadores vão percorrer 20 km até parque eólico de Viana",{"en":13,"pt":14},"Six swimmers will cover 20 kilometres between the WindFloat Atlantic floating wind farm off Viana do Castelo and the city on 18 July, in a challenge organised to mark the project's sixth anniversary. Ocean Winds, the farm's main owner, describes the feat as unprecedented, linking it to shared values of pioneering spirit, determination and resilience between elite sport and offshore wind development. The swimmers depart by boat at around 08:30 towards the wind farm and are expected to reach Praça da Liberdade in Viana do Castelo by 15:30.","Seis nadadores vão percorrer 20 quilómetros entre o parque eólico flutuante WindFloat Atlantic, ao largo de Viana do Castelo, e a cidade, no dia 18 de julho, numa iniciativa que assinala o sexto aniversário do projeto. A Ocean Winds, principal proprietária do parque, classifica o desafio como inédito, associando-o a valores partilhados entre o desporto de alto rendimento e o desenvolvimento da energia eólica offshore, como o espírito pioneiro, a determinação e a resiliência. Os atletas partem de barco por volta das 08:30 em direção ao parque eólico e deverão chegar à Praça da Liberdade às 15:30.",{"en":16,"pt":17},"Six swimmers will trace a 20km path from an offshore wind farm to the shores of Viana do Castelo.","Seis nadadores vão traçar um percurso de 20 km entre o mar e a cidade de Viana do Castelo.","2026-07-09T00:00:00+00:00","2026-09-21T12:35:01.777581+00:00","norte","energy_water_mobility",null,[24],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fominho.pt\u002Fseis-atletas-vao-nadar-20-km-entre-parque-eolico-flutuante-e-viana-do-castelo","O Minho",[],[30],{"tz":31,"slug":32,"title":35,"end_dt":38,"region":20,"excerpt":39,"is_free":22,"event_id":42,"start_dt":43,"image_url":44,"event_type":45,"duplicate_of":22},"Europe\u002FLisbon",{"en":33,"pt":34},"20-km-swim-crossing-between-the-windfloat-atlantic-wind-farm-d591cae0","travessia-a-nado-de-20-km-entre-o-parque-eolico-windfloat-at-d591cae0",{"en":36,"pt":37},"20 km swim crossing between the WindFloat Atlantic wind farm and Viana do Castelo","Travessia a nado de 20 km entre o parque eólico WindFloat Atlantic e Viana do Castelo","2026-07-18T14:30:00+00:00",{"en":40,"pt":41},"Six swimmers will cover 20 km between the WindFloat Atlantic wind farm and Viana do Castelo, as part of the project's 6th anniversary, with arrival expected at Praça da Liberdade at 3:30 PM.","Seis nadadores vão percorrer 20 km entre o parque eólico WindFloat Atlantic e Viana do Castelo, no âmbito do 6.º aniversário do projeto, com chegada prevista à Praça da Liberdade às 15h30.","d591cae0-1123-46d4-9a84-1d9d80935ad6","2026-07-18T07:30:00+00:00","https:\u002F\u002Fominho.pt\u002Fwp-content\u002Fuploads\u002Fominho-watermark\u002Fpost-678110-a162005.jpg","outdoor_activity",[47,50,54,59,63,67,72],{"code":20,"name":48},{"en":49,"pt":49},"Norte",{"code":51,"name":52},"centro",{"en":53,"pt":53},"Centro",{"code":55,"name":56},"lisboa",{"en":57,"pt":58},"Lisbon","Lisboa",{"code":60,"name":61},"alentejo",{"en":62,"pt":62},"Alentejo",{"code":64,"name":65},"algarve",{"en":66,"pt":66},"Algarve",{"code":68,"name":69},"azores",{"en":70,"pt":71},"Azores","Açores",{"code":73,"name":74},"madeira",{"en":75,"pt":75},"Madeira",[77,84,91,98,105,112,119,126],{"slug":78,"name":81},{"en":79,"pt":80},"food-agriculture","alimentacao-e-agricultura",{"en":82,"pt":83},"Food & Agriculture","Alimentação e Agricultura",{"slug":85,"name":88},{"en":86,"pt":87},"construction-housing","construcao-e-habitacao",{"en":89,"pt":90},"Construction & Housing","Construção e Habitação",{"slug":92,"name":95},{"en":93,"pt":94},"health-wellbeing","saude-e-bem-estar",{"en":96,"pt":97},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":99,"name":102},{"en":100,"pt":101},"community-social-innovation","comunidade-e-inovacao-social",{"en":103,"pt":104},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":106,"name":109},{"en":107,"pt":108},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":110,"pt":111},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":113,"name":116},{"en":114,"pt":115},"energy-water-mobility","energia-agua-e-mobilidade",{"en":117,"pt":118},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":120,"name":123},{"en":121,"pt":122},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":124,"pt":125},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":127,"name":130},{"en":128,"pt":129},"education-eco-tourism","educacao-e-ecoturismo",{"en":131,"pt":132},"Education & Eco-tourism","Educação e Ecoturismo","2026-07-10",[135],{"name":136,"slug":138,"active":25},{"en":137,"pt":22},"wind energy","wind-energy",[140,152,164],{"id":141,"slug":142,"region":22,"teaser":145,"category":21,"headline":148,"source_published_at":151},2168,{"en":143,"pt":144},"ipma-completes-seabed-and-wind-surveys-off-northern-portugal","ipma-conclui-estudos-do-fundo-marinho-e-do-vento-ao-largo-do",{"en":146,"pt":147},"A Recovery Plan-funded mapping effort covering an Atlantic area of at least 2,000 km² is about to go public, with a December date set.","Um levantamento financiado pelo PRR, que abrange pelo menos 2.000 km² de oceano, vai ser apresentado em dezembro, em Algés.",{"en":149,"pt":150},"IPMA completes seabed and wind surveys off northern Portugal ahead of offshore wind rollout","IPMA conclui estudos do fundo marinho e do vento ao largo do Norte e Centro para eólicas offshore","2026-11-25T00:00:00+00:00",{"id":153,"slug":154,"region":20,"teaser":157,"category":21,"headline":160,"source_published_at":163},1871,{"en":155,"pt":156},"20-turbine-140-mw-wind-farm-proposed-on-chaves-common-land","parque-eolico-de-140-mw-em-baldios-de-chaves-esta-em",{"en":158,"pt":159},"Camera traps set up for the project have already recorded a wolf family with cubs on the very ground earmarked for the turbines.","As câmaras de monitorização instaladas para o projeto já registaram uma família de lobos com crias no terreno onde se querem erguer as turbinas.",{"en":161,"pt":162},"20-turbine, 140 MW wind farm proposed on Chaves common land opens to public comment","Parque eólico de 140 MW em baldios de Chaves está em consulta pública","2026-11-05T00:00:00+00:00",{"id":165,"slug":166,"region":73,"teaser":169,"category":21,"headline":172,"source_published_at":175},328,{"en":167,"pt":168},"new-madeira-wind-turbines-will-not-directly-cut-electricity","novos-aerogeradores-na-madeira-nao-vao-reduzir-directamente",{"en":170,"pt":171},"A 2.7% rise and new wind turbines landed in the same month, but the regulator's own numbers tell a different story.","Uma subida de 2,7% e novos aerogeradores surgiram no mesmo mês, mas os números do regulador contam outra história.",{"en":173,"pt":174},"Madeira electricity price rise unrelated to new wind turbines, regulator shows","Aumento da eletricidade na Madeira não está ligado aos novos aerogeradores, mostra regulador","2026-09-19T00:00:00+00:00"]