[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-stcp-adds-30-electric-buses-fleet-reaches-126-7":3},{"page":4,"entities":33,"events":34,"regions":35,"categories":65,"pulseDate":122,"topics":123,"related":132},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},946,{"en":7,"pt":8},"stcp-adds-30-electric-buses-fleet-reaches-126-7","stcp-soma-30-autocarros-eletricos-e-frota-chega-aos-126-7",{"en":10,"pt":11},"STCP adds 30 electric buses, fleet reaches 126","STCP soma 30 autocarros elétricos e frota chega aos 126",{"en":13,"pt":14},"STCP began operating 30 new fully electric buses on Thursday, part of a roughly €12 million investment, with about €7 million financed by the Recovery and Resilience Plan and €5 million by shareholder municipalities. The addition brings the company's electric fleet to 126 vehicles, meaning around 28% of its operation is now emissions-free. Built by Caetano Bus with a range of about 320 kilometres, the new buses will be based at the Via Norte depot and replace older vehicles reaching the end of their working life, serving Porto, Vila Nova de Gaia, Matosinhos, Maia, Valongo and Gondomar.","A STCP iniciou esta quinta-feira a operação de 30 novos autocarros 100% elétricos, num investimento de cerca de 12 milhões de euros, dos quais 7 milhões vieram do Plano de Recuperação e Resiliência e 5 milhões dos municípios acionistas. Com esta integração, a frota elétrica da empresa passa a ter 126 veículos, o que faz com que cerca de 28% da operação seja já assegurada por meios livres de emissões. Fabricados pela Caetano Bus, com autonomia de cerca de 320 quilómetros, os novos autocarros ficam sediados na Estação de Recolha da Via Norte e substituem viaturas em final de vida útil, servindo Porto, Vila Nova de Gaia, Matosinhos, Maia, Valongo e Gondomar.",{"en":16,"pt":17},"A €12 million fleet upgrade pushes nearly a third of Porto's bus network towards zero emissions.","Um investimento de 12 milhões de euros aproxima a rede de autocarros do Porto de quase um terço sem emissões.","2026-09-17T00:00:00+00:00","2026-09-22T16:14:23.771621+00:00","norte","energy_water_mobility",null,[24,28],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fgreensavers.sapo.pt\u002Fstcp-reforca-frota-com-30-novos-autocarros-e-aumenta-para-126-o-numero-de-veiculos-eletricos","Green Savers",{"is_primary":29,"source_url":30,"source_name":31,"published_at":32},false,"https:\u002F\u002Fjornaleconomico.sapo.pt\u002Fnoticias\u002Fstcp-reforca-frota-com-30-novos-autocarros-eletricos-e-chega-aos-126-veiculos-sem-emissoes","Jornal Económico","2026-09-16T00:00:00+00:00",[],[],[36,39,43,48,52,56,61],{"code":20,"name":37},{"en":38,"pt":38},"Norte",{"code":40,"name":41},"centro",{"en":42,"pt":42},"Centro",{"code":44,"name":45},"lisboa",{"en":46,"pt":47},"Lisbon","Lisboa",{"code":49,"name":50},"alentejo",{"en":51,"pt":51},"Alentejo",{"code":53,"name":54},"algarve",{"en":55,"pt":55},"Algarve",{"code":57,"name":58},"azores",{"en":59,"pt":60},"Azores","Açores",{"code":62,"name":63},"madeira",{"en":64,"pt":64},"Madeira",[66,73,80,87,94,101,108,115],{"slug":67,"name":70},{"en":68,"pt":69},"food-agriculture","alimentacao-e-agricultura",{"en":71,"pt":72},"Food & Agriculture","Alimentação e Agricultura",{"slug":74,"name":77},{"en":75,"pt":76},"construction-housing","construcao-e-habitacao",{"en":78,"pt":79},"Construction & Housing","Construção e Habitação",{"slug":81,"name":84},{"en":82,"pt":83},"health-wellbeing","saude-e-bem-estar",{"en":85,"pt":86},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":88,"name":91},{"en":89,"pt":90},"community-social-innovation","comunidade-e-inovacao-social",{"en":92,"pt":93},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":95,"name":98},{"en":96,"pt":97},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":99,"pt":100},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":102,"name":105},{"en":103,"pt":104},"energy-water-mobility","energia-agua-e-mobilidade",{"en":106,"pt":107},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":109,"name":112},{"en":110,"pt":111},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":113,"pt":114},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":116,"name":119},{"en":117,"pt":118},"education-eco-tourism","educacao-e-ecoturismo",{"en":120,"pt":121},"Education & Eco-tourism","Educação e Ecoturismo","2026-09-18",[124,128],{"name":125,"slug":127,"active":25},{"en":126,"pt":22},"electric vehicle charging","electric-vehicle-charging",{"name":129,"slug":131,"active":25},{"en":130,"pt":22},"public rail transport","public-rail-transport",[133,145,157],{"id":134,"slug":135,"region":44,"teaser":138,"category":21,"headline":141,"source_published_at":144},2056,{"en":136,"pt":137},"portugal-gets-its-first-megawatt-truck-charger-at-new-lisbon","hub-junto-a-lisboa-estreia-o-primeiro-carregador-de-camioes",{"en":139,"pt":140},"A raised platform four metres above its old ground level hides a charger that can restore hundreds of kilometres of range during a single driver break.","O terreno subiu quatro metros para receber um carregador capaz de devolver centenas de quilómetros de autonomia durante uma única pausa obrigatória do condutor.",{"en":142,"pt":143},"Portugal gets its first megawatt truck charger at new Lisbon-area hub","Hub junto a Lisboa estreia o primeiro carregador de camiões de um megawatt do país","2026-11-19T00:00:00+00:00",{"id":146,"slug":147,"region":22,"teaser":150,"category":21,"headline":153,"source_published_at":156},1640,{"en":148,"pt":149},"mobi-e-prepares-voluntary-mobi-hub-platform-to-keep-ev-charg","mobi-e-prepara-plataforma-mobi-hub-para-manter-redes-de-carr",{"en":151,"pt":152},"The company that built Portugal's seamless charging experience is about to lose its monopoly on it, yet says it expects operators to keep coming anyway.","A empresa que criou a experiência de carregamento integrada em Portugal vai perder o monopólio dessa ligação, mas conta que os operadores continuem a bater-lhe à porta.",{"en":154,"pt":155},"MOBI.E prepares voluntary Mobi.Hub platform to keep EV charging networks linked after 2028","MOBI.E prepara plataforma Mobi.Hub para manter redes de carregamento ligadas depois de 2028","2026-10-22T00:00:00+00:00",{"id":158,"slug":159,"region":40,"teaser":162,"category":21,"headline":165,"source_published_at":168},2193,{"en":160,"pt":161},"leiria-region-demands-inclusion-in-126m-electric-public","regiao-de-leiria-exige-entrar-no-fundo-de-126-milhoes-para",{"en":163,"pt":164},"Seven of the region's ten municipalities count as low-density, yet the call that was meant to serve such areas still passed Leiria by.","Sete dos dez municípios da região são de baixa densidade, mas o aviso pensado para territórios assim deixou Leiria de fora.",{"en":166,"pt":167},"Leiria region demands inclusion in €126m electric public transport funding after being excluded","Região de Leiria exige entrar no fundo de 126 milhões para autocarros elétricos","2026-11-25T00:00:00+00:00"]