[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-en-zero-warns-data-centre-boom-could-strain-portugal-s-grid-2":3},{"page":4,"entities":32,"events":52,"regions":53,"categories":84,"pulseDate":141,"topics":142,"related":147},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":20,"news_page_sources":22},1105,{"en":7,"pt":8},"zero-warns-data-centre-boom-could-strain-portugal-s-grid-2","zero-alerta-que-expansao-de-centros-de-dados-pode-sobrecarre-2",{"en":10,"pt":11},"ZERO warns data centre boom could strain Portugal's grid","ZERO alerta que expansão de centros de dados pode sobrecarregar rede",{"en":13,"pt":14},"Environmental group ZERO has warned that the expansion of data centres in Portugal, encouraged by a recent government resolution, lacks binding sustainability criteria on energy, water and land use. It estimates that fulfilling all current grid connection requests from data centre projects could quadruple peak electricity demand to 41 GW, requiring solar panels covering 3% of national territory and water consumption equal to the entire Lisbon metropolitan area. ZERO says data centre requests already account for over 70% of power capacity sought from grid operator REN, and calls for mandatory rules on renewable energy, water use, efficiency and waste heat reuse.","A associação ambientalista ZERO alertou que a expansão dos centros de dados em Portugal, incentivada por uma recente resolução do Governo, carece de critérios vinculativos de sustentabilidade quanto a energia, água e território. Segundo a organização, a concretização de todos os pedidos de ligação à rede feitos por projetos de centros de dados poderia quadruplicar a procura de ponta para 41 GW, exigindo painéis solares numa área equivalente a 3% do território nacional e um consumo de água igual ao de toda a Área Metropolitana de Lisboa. A ZERO refere que estes pedidos já representam mais de 70% da potência solicitada à REN, e defende regras vinculativas sobre energia renovável, uso de água, eficiência e reaproveitamento de calor residual.",{"en":16,"pt":17},"One environmental group's projection: enough solar panels to cover 3% of Portugal and water use rivalling all of Lisbon.","Uma projeção da ZERO aponta para painéis solares numa área equivalente a 3% do país e um consumo de água como o de toda a Lisboa.","2026-08-31T00:00:00+00:00","2026-09-23T17:09:05.279241+00:00",null,"energy_water_mobility",[23,27],{"is_primary":24,"source_url":25,"source_name":26,"published_at":18},true,"https:\u002F\u002Fwww.ambientemagazine.com\u002Fzero-alerta-para-pressao-dos-centros-de-dados-sobre-energia-agua-e-territorio","Ambiente Magazine",{"is_primary":28,"source_url":29,"source_name":30,"published_at":31},false,"https:\u002F\u002Fzero.ong\u002Fnoticias\u002Fcentros-de-dados-podem-ser-aliados-da-transicao-verde-mas-arriscam-ser-predadores-de-recursos-sem-retorno-social","ZERO","2026-08-29T00:00:00+00:00",[33],{"confidence":34,"project":35,"profile":20},0.99,{"name":36,"slug":37,"image":38,"summary":39,"is_published":24,"project_images":42},"ZERO – Associação Sistema Terrestre Sustentável","zero-associacao-sistema-terrestre-sustentavel","https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002FDia-Nacional-da-Agua-dois-anos-apos-o-fim-anunciado-do-caudal-zero-Tejo-continua-a-ter-dias-sem-agua.jpg",{"en":40,"pt":41},"ZERO is a Portuguese environmental NGO, founded in 2015, that advocates for sustainability on energy, pollution, waste, biodiversity and social equity.","A ZERO é uma ONG ambiental portuguesa, fundada em 2015, que defende a sustentabilidade nas áreas da energia, poluição, resíduos, biodiversidade e equidade social.",[43,44,46,48,50],{"image_url":38,"is_primary":24},{"image_url":45,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002Faterro-castelo-branco.jpg",{"image_url":47,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F08\u002FZERO-considera-a-construcao-de-um-incinerador-no-Algarve-como-gestao-danosa-para-o-interesse-publico.jpg",{"image_url":49,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F08\u002Fbarragem.jpg",{"image_url":51,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002FEstado-rios-e-aquiferos-em-Portugal-esta-a-piorar.jpg",[],[54,58,62,67,71,75,80],{"code":55,"name":56},"norte",{"en":57,"pt":57},"Norte",{"code":59,"name":60},"centro",{"en":61,"pt":61},"Centro",{"code":63,"name":64},"lisboa",{"en":65,"pt":66},"Lisbon","Lisboa",{"code":68,"name":69},"alentejo",{"en":70,"pt":70},"Alentejo",{"code":72,"name":73},"algarve",{"en":74,"pt":74},"Algarve",{"code":76,"name":77},"azores",{"en":78,"pt":79},"Azores","Açores",{"code":81,"name":82},"madeira",{"en":83,"pt":83},"Madeira",[85,92,99,106,113,120,127,134],{"slug":86,"name":89},{"en":87,"pt":88},"food-agriculture","alimentacao-e-agricultura",{"en":90,"pt":91},"Food & Agriculture","Alimentação e Agricultura",{"slug":93,"name":96},{"en":94,"pt":95},"construction-housing","construcao-e-habitacao",{"en":97,"pt":98},"Construction & Housing","Construção e Habitação",{"slug":100,"name":103},{"en":101,"pt":102},"health-wellbeing","saude-e-bem-estar",{"en":104,"pt":105},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":107,"name":110},{"en":108,"pt":109},"community-social-innovation","comunidade-e-inovacao-social",{"en":111,"pt":112},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":114,"name":117},{"en":115,"pt":116},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":118,"pt":119},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":121,"name":124},{"en":122,"pt":123},"energy-water-mobility","energia-agua-e-mobilidade",{"en":125,"pt":126},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":128,"name":131},{"en":129,"pt":130},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":132,"pt":133},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":135,"name":138},{"en":136,"pt":137},"education-eco-tourism","educacao-e-ecoturismo",{"en":139,"pt":140},"Education & Eco-tourism","Educação e Ecoturismo","2026-08-30",[143],{"name":144,"slug":146,"active":24},{"en":145,"pt":20},"renewable energy systems","renewable-energy-systems",[148,160,173],{"id":149,"slug":150,"region":20,"teaser":153,"category":21,"headline":156,"source_published_at":159},1508,{"en":151,"pt":152},"energy-saving-measures-could-yield-8-5-billion-a-year-in-ben","poupanca-de-energia-pode-render-a-portugal-8-5-mil-milhoes-d",{"en":154,"pt":155},"The same savings that cut household energy costs could also prevent hundreds of premature deaths every year, according to the study's national estimates.","As mesmas poupanças que aliviam a fatura de energia das famílias podem evitar centenas de mortes prematuras por ano, segundo as estimativas nacionais do estudo.",{"en":157,"pt":158},"Energy-saving measures could yield €8.5 billion a year in benefits for Portugal by 2030","Poupança de energia pode render a Portugal 8,5 mil milhões de euros anuais até 2030","2026-10-12T00:00:00+00:00",{"id":161,"slug":162,"region":63,"teaser":165,"category":168,"headline":169,"source_published_at":172},255,{"en":163,"pt":164},"galp-and-isa-test-first-vineyard-agrivoltaic-project-in-port","galp-e-isa-testam-primeiro-projeto-agrivoltaico-em-vinha-em",{"en":166,"pt":167},"Solar panels over vines in Lisbon just produced Portugal's first wine grown under an agrivoltaic canopy.","Painéis solares sobre videiras em Lisboa produziram o primeiro vinho português nascido sob uma cobertura agrivoltaica.","food_agriculture",{"en":170,"pt":171},"Galp and ISA test first vineyard agrivoltaic project in Portugal","Galp e ISA testam primeiro projeto agrivoltaico em vinha em Portugal","2026-09-16T00:00:00+00:00",{"id":174,"slug":175,"region":59,"teaser":178,"category":21,"headline":181,"source_published_at":184},1111,{"en":176,"pt":177},"quercus-warns-two-abrantes-data-centres-could-use-19-times-l","quercus-alerta-que-dois-centros-de-dados-em-abrantes-podem-c",{"en":179,"pt":180},"One project already got a unanimous green light and 16.2 million euros in tax breaks, warns Quercus.","Um dos projetos já teve parecer favorável unânime e 16,2 milhões de euros em isenções fiscais, alerta a Quercus.",{"en":182,"pt":183},"Quercus warns two Abrantes data centres could use 19 times local power","Quercus alerta que dois centros de dados em Abrantes podem consumir 19 vezes mais eletricidade","2026-08-27T00:00:00+00:00"]