[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-aguas-do-alentejo-vai-construir-15-unidades-fotovoltaicas":3},{"page":4,"entities":32,"events":33,"regions":34,"categories":64,"pulseDate":121,"topics":122,"related":131},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1236,{"en":7,"pt":8},"alentejo-water-utility-to-build-15-solar-plants","aguas-do-alentejo-vai-construir-15-unidades-fotovoltaicas",{"en":10,"pt":11},"Águas do Alentejo to build 15 solar power units for self-consumption","Águas do Alentejo vai construir 15 unidades solares para autoconsumo",{"en":13,"pt":14},"Águas Públicas do Alentejo (AgdA) will invest nearly €1.8 million to build 15 photovoltaic power units for self-consumption at water and wastewater facilities across the Beja, Évora and Setúbal districts. A public tender was launched on 3 November, with a 40-month execution period. The company says about 80% of the energy produced could be used internally in its water supply and sanitation infrastructure, cutting reliance on the grid, costs and environmental impact. The move is part of AgdA's plan to reach full energy self-sufficiency from renewable sources by 2030.","A Águas Públicas do Alentejo (AgdA) vai investir cerca de 1,8 milhões de euros na construção de 15 unidades de produção de energia elétrica fotovoltaica para autoconsumo, distribuídas por infraestruturas de água e saneamento nos distritos de Beja, Évora e Setúbal. O concurso público para conceção e construção foi lançado a 3 de novembro, com um prazo de execução de 40 meses. Segundo a empresa, cerca de 80% da energia produzida poderá ser utilizada internamente, reduzindo a dependência da rede elétrica, os custos e o impacto ambiental. A iniciativa insere-se no objetivo de atingir a autossuficiência energética até 2030, com recurso exclusivo a fontes renováveis.",{"en":16,"pt":17},"A €1.8 million tender covers facilities from Alvito to Montemor-o-Novo, with construction stretching over more than three years.","Um concurso de 1,8 milhões de euros abrange infraestruturas de Alvito a Montemor-o-Novo, com obra prevista para mais de três anos.","2026-06-11T00:00:00+00:00","2026-09-23T19:10:40.140376+00:00","alentejo","energy_water_mobility",null,[24,28],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Falentejo.sulinformacao.pt\u002F2026\u002F06\u002Faguas-do-alentejo-vai-construir-15-unidades-de-producao-de-energia-eletrica","Sul Informação",{"is_primary":29,"source_url":30,"source_name":31,"published_at":18},false,"https:\u002F\u002Fgreensavers.sapo.pt\u002Faguas-do-alentejo-vai-construir-15-unidades-de-producao-de-energia-eletrica","Green Savers",[],[],[35,39,43,48,51,55,60],{"code":36,"name":37},"norte",{"en":38,"pt":38},"Norte",{"code":40,"name":41},"centro",{"en":42,"pt":42},"Centro",{"code":44,"name":45},"lisboa",{"en":46,"pt":47},"Lisbon","Lisboa",{"code":20,"name":49},{"en":50,"pt":50},"Alentejo",{"code":52,"name":53},"algarve",{"en":54,"pt":54},"Algarve",{"code":56,"name":57},"azores",{"en":58,"pt":59},"Azores","Açores",{"code":61,"name":62},"madeira",{"en":63,"pt":63},"Madeira",[65,72,79,86,93,100,107,114],{"slug":66,"name":69},{"en":67,"pt":68},"food-agriculture","alimentacao-e-agricultura",{"en":70,"pt":71},"Food & Agriculture","Alimentação e Agricultura",{"slug":73,"name":76},{"en":74,"pt":75},"construction-housing","construcao-e-habitacao",{"en":77,"pt":78},"Construction & Housing","Construção e Habitação",{"slug":80,"name":83},{"en":81,"pt":82},"health-wellbeing","saude-e-bem-estar",{"en":84,"pt":85},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":87,"name":90},{"en":88,"pt":89},"community-social-innovation","comunidade-e-inovacao-social",{"en":91,"pt":92},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":94,"name":97},{"en":95,"pt":96},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":98,"pt":99},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":101,"name":104},{"en":102,"pt":103},"energy-water-mobility","energia-agua-e-mobilidade",{"en":105,"pt":106},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":108,"name":111},{"en":109,"pt":110},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":112,"pt":113},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":115,"name":118},{"en":116,"pt":117},"education-eco-tourism","educacao-e-ecoturismo",{"en":119,"pt":120},"Education & Eco-tourism","Educação e Ecoturismo","2026-06-11",[123,127],{"name":124,"slug":126,"active":25},{"en":125,"pt":22},"solar power systems","solar-power-systems",{"name":128,"slug":130,"active":25},{"en":129,"pt":22},"energy resilience","energy-resilience",[132,144,156],{"id":133,"slug":134,"region":20,"teaser":137,"category":21,"headline":140,"source_published_at":143},757,{"en":135,"pt":136},"opinion-piece-questions-ownership-behind-portugal-s-solar-bo","artigo-de-opiniao-questiona-quem-e-dono-do-boom-solar-em-por",{"en":138,"pt":139},"A planner looks at Europe's largest solar plant, built on cleared Alentejo montado, and asks who actually profits.","Um planeador olha para a maior central solar da Europa, erguida sobre montado arrancado no Alentejo, e pergunta quem lucra.",{"en":141,"pt":142},"Opinion piece questions ownership behind Portugal's solar boom","Artigo de opinião questiona quem é dono do boom solar em Portugal","2026-06-26T00:00:00+00:00",{"id":145,"slug":146,"region":61,"teaser":149,"category":21,"headline":152,"source_published_at":155},1699,{"en":147,"pt":148},"camacha-school-completes-2m-retrofit-expected-to-halve-its-e","escola-da-camacha-conclui-reabilitacao-de-dois-milhoes-que-d",{"en":150,"pt":151},"About 150 windows, a battery-backed solar system and a bill that went past two million euros for one school.","Cerca de 150 janelas isoladas, solar com baterias e uma fatura que passou os dois milhões de euros para uma única escola.",{"en":153,"pt":154},"Camacha school completes €2m retrofit expected to halve its energy costs","Escola da Camacha conclui reabilitação de dois milhões que deverá cortar a energia a metade","2026-10-25T00:00:00+00:00",{"id":157,"slug":158,"region":22,"teaser":161,"category":21,"headline":164,"source_published_at":167},2028,{"en":159,"pt":160},"mcdonald-s-portugal-signs-27-restaurants-up-to-edp-s-shared","mcdonald-s-portugal-liga-27-restaurantes-aos-bairros-solares",{"en":162,"pt":163},"The restaurants will run on sunshine, yet not a single solar panel will go on their roofs.","Os restaurantes vão funcionar com energia do sol, mas nenhum painel solar será instalado nos seus telhados.",{"en":165,"pt":166},"McDonald's Portugal signs 27 restaurants up to EDP's shared solar neighbourhoods","McDonald's Portugal liga 27 restaurantes aos Bairros Solares da EDP","2026-11-17T00:00:00+00:00"]