[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-assembleia-municipal-pede-a-camara-manutencao-dos-lagos-dos":3},{"page":4,"entities":43,"events":44,"regions":45,"categories":75,"pulseDate":132,"topics":133,"related":146},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1433,{"en":7,"pt":8},"lisbon-assembly-urges-council-to-maintain-garden-lakes","assembleia-municipal-pede-a-camara-manutencao-dos-lagos-dos",{"en":10,"pt":11},"Lisbon assembly urges council to maintain garden lakes","Assembleia Municipal pede à Câmara manutenção dos lagos dos jardins de Lisboa",{"en":13,"pt":14},"Lisbon's Municipal Assembly approved recommendations, proposed by PEV and PAN, urging the city council to maintain the lakes in Lisbon's gardens as habitats for various animal species. The motions followed complaints about degraded water, silt build-up and inadequate conditions, notably at the Estufa Fria lake in Parque Eduardo VII, which underwent drainage and cleaning works. The assembly asked the council for regular maintenance, natural water treatment solutions, shelter structures for animals and better visitor information. Councillor Joana Baptista said the city already invests over €2.5 million yearly maintaining its 68 lakes and more than 160 fountains.","A Assembleia Municipal de Lisboa aprovou recomendações, apresentadas pelo PEV e pelo PAN, para que a Câmara assegure a manutenção dos lagos dos jardins da cidade enquanto habitats de diversas espécies animais. As propostas surgiram após denúncias sobre água degradada, acumulação de lamas e condições inadequadas, nomeadamente no lago da Estufa Fria, no Parque Eduardo VII, que foi entretanto sujeito a obras de drenagem e limpeza. A assembleia pediu à Câmara manutenção regular, soluções naturais para tratamento da água, estruturas de abrigo para os animais e mais informação aos visitantes. A vereadora Joana Baptista afirmou que o município já investe mais de 2,5 milhões de euros por ano na manutenção dos 68 lagos e mais de 160 fontes da cidade.",{"en":16,"pt":17},"Complaints about murky, sludge-filled garden lakes in Lisbon pushed councillors to act.","Queixas sobre lagos de jardim turvos e cheios de lama em Lisboa levaram os deputados municipais a agir.","2026-10-07T00:00:00+00:00","2026-10-14T02:49:16.755607+00:00","lisboa","ecosystems_biodiversity",null,[24,28,33,36,40],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fobservador.pt\u002F2026\u002F10\u002F07\u002Fassembleia-municipal-recomenda-a-camara-manutencao-dos-lagos-dos-jardins-de-lisboa","Observador",{"is_primary":29,"source_url":30,"source_name":31,"published_at":32},false,"https:\u002F\u002Fgreensavers.sapo.pt\u002Fagencia-portuguesa-do-ambiente-reprova-unidade-de-biocombustiveis-na-figueira-da-foz","Green Savers","2026-10-08T00:00:00+00:00",{"is_primary":29,"source_url":34,"source_name":35,"published_at":32},"https:\u002F\u002Fjornalptgreen.pt\u002Fnoticia\u002Fapa-reprova-unidade-de-biocombustiveis-na-figueira-da-foz","Jornal PT Green",{"is_primary":29,"source_url":37,"source_name":38,"published_at":39},"https:\u002F\u002Fwww.dnoticias.pt\u002F2026\u002F10\u002F9\u002F508417-jpp-critica-chumbo-de-proposta-sobre-viagens-aereas-e-ligacao-maritima","Diário de Notícias da Madeira","2026-10-09T00:00:00+00:00",{"is_primary":29,"source_url":41,"source_name":42,"published_at":39},"https:\u002F\u002Fwww.jm-madeira.pt\u002Fnot%C3%ADcias\u002Fregi-o\u002F30006769\u002Fjpp-critica-psd-e-chega-por-rejeicao-de-proposta-sobre-transportes-para-a-madeira.html","JM Madeira",[],[],[46,50,54,58,62,66,71],{"code":47,"name":48},"norte",{"en":49,"pt":49},"Norte",{"code":51,"name":52},"centro",{"en":53,"pt":53},"Centro",{"code":20,"name":55},{"en":56,"pt":57},"Lisbon","Lisboa",{"code":59,"name":60},"alentejo",{"en":61,"pt":61},"Alentejo",{"code":63,"name":64},"algarve",{"en":65,"pt":65},"Algarve",{"code":67,"name":68},"azores",{"en":69,"pt":70},"Azores","Açores",{"code":72,"name":73},"madeira",{"en":74,"pt":74},"Madeira",[76,83,90,97,104,111,118,125],{"slug":77,"name":80},{"en":78,"pt":79},"food-agriculture","alimentacao-e-agricultura",{"en":81,"pt":82},"Food & Agriculture","Alimentação e Agricultura",{"slug":84,"name":87},{"en":85,"pt":86},"construction-housing","construcao-e-habitacao",{"en":88,"pt":89},"Construction & Housing","Construção e Habitação",{"slug":91,"name":94},{"en":92,"pt":93},"health-wellbeing","saude-e-bem-estar",{"en":95,"pt":96},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":98,"name":101},{"en":99,"pt":100},"community-social-innovation","comunidade-e-inovacao-social",{"en":102,"pt":103},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":105,"name":108},{"en":106,"pt":107},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":109,"pt":110},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":112,"name":115},{"en":113,"pt":114},"energy-water-mobility","energia-agua-e-mobilidade",{"en":116,"pt":117},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":119,"name":122},{"en":120,"pt":121},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":123,"pt":124},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":126,"name":129},{"en":127,"pt":128},"education-eco-tourism","educacao-e-ecoturismo",{"en":130,"pt":131},"Education & Eco-tourism","Educação e Ecoturismo","2026-10-10",[134,138,142],{"name":135,"slug":137,"active":25},{"en":136,"pt":22},"active mobility","active-mobility",{"name":139,"slug":141,"active":25},{"en":140,"pt":22},"environmental impact assessment","environmental-impact-assessment",{"name":143,"slug":145,"active":25},{"en":144,"pt":22},"water supply and distribution","water-supply-and-distribution",[147,160,172],{"id":148,"slug":149,"region":63,"teaser":152,"category":155,"headline":156,"source_published_at":159},1779,{"en":150,"pt":151},"algarve-presses-for-faro-seville-railway-by-2040-and-a","algarve-exige-ligacao-ferroviaria-faro-sevilha-ate-2040-e",{"en":153,"pt":154},"A river crossing with €14 million already in hand and Portuguese studies finished is still waiting on a decision from the Spanish side.","Uma travessia do rio com 14 milhões de euros garantidos e estudos portugueses concluídos continua à espera de uma decisão do lado espanhol.","energy_water_mobility",{"en":157,"pt":158},"Algarve presses for Faro–Seville railway by 2040 and a Guadiana bridge","Algarve exige ligação ferroviária Faro–Sevilha até 2040 e ponte sobre o Guadiana","2026-10-30T00:00:00+00:00",{"id":161,"slug":162,"region":59,"teaser":165,"category":155,"headline":168,"source_published_at":171},967,{"en":163,"pt":164},"alto-alentejo-signs-15m-contract-to-link-pisao-dam-to-water","cimaa-assina-contrato-de-15-milhoes-para-ligar-pisao-a-eta-d",{"en":166,"pt":167},"A 25-kilometre pipeline network across three Alentejo municipalities has just cleared its first major hurdle, but the dam itself still faces judges in October.","Uma rede de 25 quilómetros de condutas por três concelhos alentejanos acaba de avançar, mas a barragem ainda vai a tribunal em outubro.",{"en":169,"pt":170},"Alto Alentejo signs €15m contract to link Pisão dam to water plant","CIMAA assina contrato de 15 milhões para ligar Pisão à ETA de Póvoa e Meadas","2026-09-22T00:00:00+00:00",{"id":173,"slug":174,"region":63,"teaser":177,"category":21,"headline":180,"source_published_at":183},1545,{"en":175,"pt":176},"algarve-conservation-group-files-formal-objection-to-90m-fou","almargem-entrega-parecer-negativo-ao-projeto-de-90-milhoes-p",{"en":178,"pt":179},"Two-thirds of the fish in this southern stream are native, and the association says a concrete wall would put one species at risk of local extinction.","Dois terços dos peixes desta ribeira do Sul são nativos, e a associação teme que uma parede de betão leve uma espécie à extinção local.",{"en":181,"pt":182},"Algarve conservation group files formal objection to €90m Foupana dam","Almargem entrega parecer negativo ao projeto de 90 milhões para a Barragem da Foupana","2026-10-13T00:00:00+00:00"]