[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-empresa-de-residuos-do-alentejo-reduz-deposicao-em-aterro-pa":3},{"page":4,"entities":33,"events":34,"regions":35,"categories":65,"pulseDate":122,"topics":123,"related":132},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1206,{"en":7,"pt":8},"alentejo-waste-firm-cuts-landfill-share-to-15","empresa-de-residuos-do-alentejo-reduz-deposicao-em-aterro-pa",{"en":10,"pt":11},"Alentejo waste firm cuts landfill share to 15%","Empresa de resíduos do Alentejo reduz deposição em aterro para 15%",{"en":13,"pt":14},"Resialentejo, which manages waste in Baixo Alentejo, has cut the share of urban waste sent to landfill from 94% in 2012 to 15% in 2026, nearing the EU's 10% target for 2030. The company now sends 65% of treated waste for recycling, above the EU's 63% goal set for 2030. A new landfill is under construction to serve its eight municipalities, as the current site has about two years of capacity left. Resialentejo is also studying whether it could offer spare capacity at the new facility to other regional waste management systems facing shortages nationally.","A Resialentejo, responsável pela gestão de resíduos no Baixo Alentejo, reduziu a percentagem de resíduos urbanos enviados para aterro de 94% em 2012 para 15% em 2026, aproximando-se da meta europeia de 10% prevista para 2030. A empresa encaminha atualmente 65% dos resíduos tratados para reciclagem, superando já o objetivo europeu de 63% definido para 2030. Está em construção um novo aterro sanitário para servir os oito concelhos da sua área de atuação, uma vez que o atual tem apenas cerca de dois anos de vida útil estimada. A empresa estuda ainda disponibilizar parte da capacidade da nova infraestrutura a outros sistemas de gestão de resíduos que enfrentam dificuldades a nível nacional.",{"en":16,"pt":17},"While most Portuguese landfills built in the 2000s are nearing capacity, one Alentejo firm is already close to an EU 2030 target.","Enquanto a maioria dos aterros portugueses construídos nos anos 2000 se aproxima do limite, uma empresa alentejana já quase cumpre uma meta europeia de 2030.","2026-06-24T00:00:00+00:00","2026-09-23T17:09:27.779241+00:00","alentejo","products_circular",null,[24,28],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fwww.ambienteonline.pt\u002Fnoticias\u002Fresialentejo-reduz-deposicao-em-aterro-para-15","Ambiente Online",{"is_primary":29,"source_url":30,"source_name":31,"published_at":32},false,"https:\u002F\u002Fwww.ambientemagazine.com\u002Fresialentejo-reduz-deposicao-de-residuos-em-aterro-de-94-para-15","Ambiente Magazine","2026-06-26T00:00:00+00:00",[],[],[36,40,44,49,52,56,61],{"code":37,"name":38},"norte",{"en":39,"pt":39},"Norte",{"code":41,"name":42},"centro",{"en":43,"pt":43},"Centro",{"code":45,"name":46},"lisboa",{"en":47,"pt":48},"Lisbon","Lisboa",{"code":20,"name":50},{"en":51,"pt":51},"Alentejo",{"code":53,"name":54},"algarve",{"en":55,"pt":55},"Algarve",{"code":57,"name":58},"azores",{"en":59,"pt":60},"Azores","Açores",{"code":62,"name":63},"madeira",{"en":64,"pt":64},"Madeira",[66,73,80,87,94,101,108,115],{"slug":67,"name":70},{"en":68,"pt":69},"food-agriculture","alimentacao-e-agricultura",{"en":71,"pt":72},"Food & Agriculture","Alimentação e Agricultura",{"slug":74,"name":77},{"en":75,"pt":76},"construction-housing","construcao-e-habitacao",{"en":78,"pt":79},"Construction & Housing","Construção e Habitação",{"slug":81,"name":84},{"en":82,"pt":83},"health-wellbeing","saude-e-bem-estar",{"en":85,"pt":86},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":88,"name":91},{"en":89,"pt":90},"community-social-innovation","comunidade-e-inovacao-social",{"en":92,"pt":93},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":95,"name":98},{"en":96,"pt":97},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":99,"pt":100},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":102,"name":105},{"en":103,"pt":104},"energy-water-mobility","energia-agua-e-mobilidade",{"en":106,"pt":107},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":109,"name":112},{"en":110,"pt":111},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":113,"pt":114},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":116,"name":119},{"en":117,"pt":118},"education-eco-tourism","educacao-e-ecoturismo",{"en":120,"pt":121},"Education & Eco-tourism","Educação e Ecoturismo","2026-06-25",[124,128],{"name":125,"slug":127,"active":25},{"en":126,"pt":22},"landfill management","landfill-management",{"name":129,"slug":131,"active":25},{"en":130,"pt":22},"plastic recycling","plastic-recycling",[133,145,157],{"id":134,"slug":135,"region":20,"teaser":138,"category":21,"headline":141,"source_published_at":144},2027,{"en":136,"pt":137},"five-alentejo-councils-lift-recycling-to-43-but-still","cinco-concelhos-do-alentejo-sobem-a-reciclagem-para-43-mas",{"en":139,"pt":140},"Glass is recovered at 67%, plastic at barely 37%, and the region still ranks among the better performers nationally despite the landfill figure.","O vidro é recuperado em 67% e o plástico em apenas 37%, e a região continua entre as melhores do país, apesar do peso do aterro.",{"en":142,"pt":143},"Five Alentejo councils lift recycling to 43% but still landfill most of their waste","Cinco concelhos do Alentejo sobem a reciclagem para 43%, mas mantêm o aterro como destino principal","2026-11-17T00:00:00+00:00",{"id":146,"slug":147,"region":53,"teaser":150,"category":21,"headline":153,"source_published_at":156},1269,{"en":148,"pt":149},"quercus-opposes-planned-algarve-incinerator-urges-alternativ-2","quercus-opoe-se-a-incineradora-prevista-para-o-algarve-e-ped-2",{"en":151,"pt":152},"The environmental group wants a minister to answer three pointed questions about a hidden consultancy report.","A associação quer que a ministra responda a três perguntas sobre um estudo da Ramboll que nunca foi divulgado.",{"en":154,"pt":155},"Quercus opposes planned Algarve incinerator, urges alternatives","Quercus opõe-se a incineradora prevista para o Algarve e pede alternativas","2026-09-03T00:00:00+00:00",{"id":158,"slug":159,"region":37,"teaser":162,"category":21,"headline":165,"source_published_at":168},1931,{"en":160,"pt":161},"valongo-landfill-operator-says-inspection-supports-licence","recivalongo-diz-que-vistoria-sustenta-renovacao-da-licenca",{"en":163,"pt":164},"The operator calls the faults one-off and blames political opportunism and a NIMBY effect, while the minister has given it 60 working days to fix them.","A empresa fala em falhas pontuais e acusa aproveitamento político e efeito NIMBY, enquanto a ministra lhe deu 60 dias úteis para corrigir.",{"en":166,"pt":167},"Valongo landfill operator says inspection supports licence renewal despite closure threat","Recivalongo diz que vistoria sustenta renovação da licença do aterro de Sobrado","2026-11-12T00:00:00+00:00"]