[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-etar-de-ourem-junto-ao-nabao-vai-ser-modernizada-com-5-2-mil":3},{"page":4,"entities":32,"events":33,"regions":34,"categories":64,"pulseDate":121,"topics":122,"related":127},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1518,{"en":7,"pt":8},"ourem-wastewater-plant-on-the-nabao-gets-5-2m-upgrade-with-e","etar-de-ourem-junto-ao-nabao-vai-ser-modernizada-com-5-2-mil",{"en":10,"pt":11},"Ourém wastewater plant on the Nabão gets €5.2m upgrade with EU cohesion funds","ETAR de Ourém junto ao Nabão vai ser modernizada com 5,2 milhões e fundos europeus",{"en":13,"pt":14},"Tejo Ambiente has secured approval for a €5.2 million overhaul of the Alto Nabão wastewater treatment plant at Formigais, in Ourém. The work will tackle hydraulic overload and fluctuating flows, modernise biological treatment, refurbish existing equipment, strengthen monitoring and automation, and improve sludge handling. It builds on existing infrastructure rather than new construction. The Nabão is classed as a sensitive zone and has suffered pollution episodes over the years, so discharge standards are strict. The Cohesion Fund covers €4.4 million, or 85% of the cost, through the Sustentável 2030 programme. Completion is due by 31 May 2029.","A Tejo Ambiente viu aprovada a candidatura para remodelar a ETAR do Alto Nabão, em Formigais, no concelho de Ourém, num investimento superior a 5,2 milhões de euros. A obra vai responder à sobrecarga hidráulica e à variação dos caudais, modernizar o tratamento biológico, reabilitar equipamentos existentes, reforçar a monitorização e a automação e melhorar a gestão da fase sólida, aproveitando as infraestruturas atuais em vez de construir de novo. O Nabão é zona sensível e tem sofrido episódios de poluição, pelo que as exigências na descarga são rigorosas. O Fundo de Coesão assegura 4,4 milhões de euros, 85% do total, através do programa Sustentável 2030. A conclusão está prevista até 31 de maio de 2029.",{"en":16,"pt":17},"The upgrade targets a river repeatedly hit by pollution, and Brussels is footing most of the bill, with a finish line set for May 2029.","A obra visa um rio repetidamente afetado por poluição, com a maior parte da fatura paga por fundos europeus e meta de conclusão fixada para maio de 2029.","2026-10-13T00:00:00+00:00","2026-10-14T02:49:13.349043+00:00","centro","energy_water_mobility",null,[24,28],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fwww.ambientemagazine.com\u002Ftejo-ambiente-investe-52me-na-etar-do-alto-nabao-para-reforcar-protecao-ambiental-do-rio","Ambiente Magazine",{"is_primary":29,"source_url":30,"source_name":31,"published_at":18},false,"https:\u002F\u002Fwww.jornaldeleiria.pt\u002Fnoticia\u002Fourem-etar-do-alto-nabao-vai-receber-investimento-de-52-milhoes-de-euros","Jornal de Leiria",[],[],[35,39,42,47,51,55,60],{"code":36,"name":37},"norte",{"en":38,"pt":38},"Norte",{"code":20,"name":40},{"en":41,"pt":41},"Centro",{"code":43,"name":44},"lisboa",{"en":45,"pt":46},"Lisbon","Lisboa",{"code":48,"name":49},"alentejo",{"en":50,"pt":50},"Alentejo",{"code":52,"name":53},"algarve",{"en":54,"pt":54},"Algarve",{"code":56,"name":57},"azores",{"en":58,"pt":59},"Azores","Açores",{"code":61,"name":62},"madeira",{"en":63,"pt":63},"Madeira",[65,72,79,86,93,100,107,114],{"slug":66,"name":69},{"en":67,"pt":68},"food-agriculture","alimentacao-e-agricultura",{"en":70,"pt":71},"Food & Agriculture","Alimentação e Agricultura",{"slug":73,"name":76},{"en":74,"pt":75},"construction-housing","construcao-e-habitacao",{"en":77,"pt":78},"Construction & Housing","Construção e Habitação",{"slug":80,"name":83},{"en":81,"pt":82},"health-wellbeing","saude-e-bem-estar",{"en":84,"pt":85},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":87,"name":90},{"en":88,"pt":89},"community-social-innovation","comunidade-e-inovacao-social",{"en":91,"pt":92},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":94,"name":97},{"en":95,"pt":96},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":98,"pt":99},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":101,"name":104},{"en":102,"pt":103},"energy-water-mobility","energia-agua-e-mobilidade",{"en":105,"pt":106},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":108,"name":111},{"en":109,"pt":110},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":112,"pt":113},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":115,"name":118},{"en":116,"pt":117},"education-eco-tourism","educacao-e-ecoturismo",{"en":119,"pt":120},"Education & Eco-tourism","Educação e Ecoturismo","2026-10-14",[123],{"name":124,"slug":126,"active":25},{"en":125,"pt":22},"wastewater treatment","wastewater-treatment",[128,141,154],{"id":129,"slug":130,"region":20,"teaser":133,"category":136,"headline":137,"source_published_at":140},2165,{"en":131,"pt":132},"gnr-finds-illegal-pig-farm-sludge-discharge-on-forest-land","gnr-deteta-descarga-ilegal-de-lamas-de-suinicultura-em",{"en":134,"pt":135},"The runoff did not come from a pipe or a lagoon breach, but from a pile of waste left lying after a routine clean-out.","O escorrimento não veio de um cano nem de uma rutura na lagoa, mas de um monte de lamas deixado depois de uma limpeza de rotina.","food_agriculture",{"en":138,"pt":139},"GNR finds illegal pig-farm sludge discharge on forest land in Alcobaça","GNR deteta descarga ilegal de lamas de suinicultura em terreno florestal de Alcobaça","2026-11-26T00:00:00+00:00",{"id":142,"slug":143,"region":36,"teaser":146,"category":149,"headline":150,"source_published_at":153},2017,{"en":144,"pt":145},"environmental-group-zero-warns-sewage-sludge-scandal-may-be","zero-avisa-que-esquema-de-lamas-de-etar-pode-ser-apenas-a",{"en":147,"pt":148},"A 2018 study had already flagged 130,000 tonnes of sludge with no known destination, and the alert apparently went nowhere.","Já em 2018 um estudo apontava 130 mil toneladas de lamas sem destino conhecido, e o alerta parece ter caído em saco roto.","products_circular",{"en":151,"pt":152},"Environmental group Zero warns sewage sludge scandal may be tip of the iceberg","Zero avisa que esquema de lamas de ETAR pode ser apenas a ponta do iceberg","2026-11-17T00:00:00+00:00",{"id":155,"slug":156,"region":22,"teaser":159,"category":21,"headline":162,"source_published_at":153},2020,{"en":157,"pt":158},"zero-says-it-warned-apa-in-2018-that-half-of-sewage-sludge","zero-diz-ter-avisado-a-apa-em-2018-de-que-metade-das-lamas",{"en":160,"pt":161},"The agency already held the records that could have exposed it, yet more than a decade passed without the alert reaching inspectors.","A agência já tinha nas mãos os registos que podiam denunciar o caso, mas passou mais de uma década sem que o alerta chegasse aos fiscalizadores.",{"en":163,"pt":164},"ZERO says it warned APA in 2018 that half of sewage sludge had no known destination","ZERO diz ter avisado a APA em 2018 de que metade das lamas de ETAR não tinha destino"]