[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-porto-e-matosinhos-vao-reabilitar-ribeira-da-riguinha-por-8":3},{"page":4,"entities":28,"events":63,"regions":64,"categories":94,"pulseDate":151,"topics":152,"related":157},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},728,{"en":7,"pt":8},"porto-and-matosinhos-plan-8-9m-clean-up-of-riguinha-stream","porto-e-matosinhos-vao-reabilitar-ribeira-da-riguinha-por-8",{"en":10,"pt":11},"Porto and Matosinhos plan €8.9m clean-up of Riguinha stream","Porto e Matosinhos vão reabilitar ribeira da Riguinha por 8,9 milhões",{"en":13,"pt":14},"The municipalities of Porto and Matosinhos, together with port authority APDL, are preparing an €8.9 million project to rehabilitate the Riguinha stream by 2028. The waterway, which flows mostly through Matosinhos before reaching the sea near the border with Porto, has long been blamed for degrading bathing water quality at Internacional and Matosinhos beaches due to illegal sewage connections. The plan involves extending the discharge canal by about 650 metres to divert polluted water away from the bathing zone. Costs will be split 50% Matosinhos, 25% Porto and 25% APDL, with Porto's council due to vote on the protocol next Tuesday.","Os municípios de Porto e Matosinhos, em conjunto com a Administração dos Portos do Douro, Leixões e Viana do Castelo (APDL), preparam um investimento de 8,9 milhões de euros para reabilitar a ribeira da Riguinha até 2028. O curso de água, que percorre maioritariamente Matosinhos antes de desaguar junto à fronteira com o Porto, tem sido apontado como responsável pela degradação da qualidade da água balnear nas praias Internacional e de Matosinhos, devido a centenas de ligações ilegais de águas residuais. A solução passa pelo prolongamento do canal de descarga em cerca de 650 metros, para afastar as águas poluídas da zona balnear. O custo será repartido entre Matosinhos (50%), Porto (25%) e APDL (25%), com a câmara portuense a votar o protocolo na próxima terça-feira.",{"en":16,"pt":17},"Hundreds of illegal sewage connections have been fouling two Porto-area beaches for years.","Centenas de ligações ilegais têm poluído há anos duas praias da região do Porto.","2026-07-03T00:00:00+00:00","2026-09-21T12:35:03.087177+00:00","norte","ecosystems_biodiversity",null,[24],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fgreensavers.sapo.pt\u002Fporto-matosinhos-e-apdl-reabilitam-ribeira-da-riguinha-ate-2028-por-89me","Green Savers",[29],{"confidence":30,"project":31,"profile":22},0.99,{"name":32,"slug":33,"image":22,"summary":34,"is_published":25,"project_images":37},"AdEPorto – Agência de Energia do Porto","adeporto-agencia-de-energia-do-porto",{"en":35,"pt":36},"AdEPorto is the regional energy agency for the Porto metropolitan area. It coordinates European-funded projects and local initiatives on renewable energy, energy efficiency and tackling energy poverty.","A AdEPorto é a agência regional de energia da área metropolitana do Porto. Coordena projetos financiados pela União Europeia e iniciativas locais sobre energias renováveis, eficiência energética e combate à pobreza energética.",[38,41,43,45,47,49,51,53,55,57,59,61],{"image_url":39,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fade-quemsomoscover_1160.png\u002F1920x400\u002F2\u002F1920x400",false,{"image_url":42,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fshutterstock1032678361_396.jpg\u002F1920x400\u002F2\u002F1920x400",{"image_url":44,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fbannerrecomendacoes_197.jpg\u002F1920x400\u002F2\u002F1920x400",{"image_url":46,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fadeportobanner_1051.png\u002F1920x878\u002F2\u002F1920x878\u002F",{"image_url":48,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fnrd-fdqfzhy9ig4-unsplash_664.jpg\u002F1150x300\u002F2\u002F1150x300\u002F",{"image_url":50,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fshutterstock249276094_662.jpg\u002F1150x300\u002F2\u002F1150x300\u002F",{"image_url":52,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fshutterstock249276094_662.jpg\u002F545x290\u002F2\u002F",{"image_url":54,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fnrd-fdqfzhy9ig4-unsplash_664.jpg\u002F545x290\u002F2\u002F",{"image_url":56,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fmaquinas-de-lavar_362.jpg\u002F545x290\u002F2\u002F",{"image_url":58,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fadeproject-coverobservatorioenergia_1092.png\u002F545x290\u002F2\u002F545x290",{"image_url":60,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fadeproject-coverrelatorioanual_1095.png\u002F545x290\u002F2\u002F545x290",{"image_url":62,"is_primary":40},"https:\u002F\u002Fwww.adeporto.eu\u002Fimagegen\u002F\u002Fclient\u002Ffiles\u002F0000000001\u002Fimagem-4_755.jpg\u002F545x365\u002F2\u002F",[],[65,68,72,77,81,85,90],{"code":20,"name":66},{"en":67,"pt":67},"Norte",{"code":69,"name":70},"centro",{"en":71,"pt":71},"Centro",{"code":73,"name":74},"lisboa",{"en":75,"pt":76},"Lisbon","Lisboa",{"code":78,"name":79},"alentejo",{"en":80,"pt":80},"Alentejo",{"code":82,"name":83},"algarve",{"en":84,"pt":84},"Algarve",{"code":86,"name":87},"azores",{"en":88,"pt":89},"Azores","Açores",{"code":91,"name":92},"madeira",{"en":93,"pt":93},"Madeira",[95,102,109,116,123,130,137,144],{"slug":96,"name":99},{"en":97,"pt":98},"food-agriculture","alimentacao-e-agricultura",{"en":100,"pt":101},"Food & Agriculture","Alimentação e Agricultura",{"slug":103,"name":106},{"en":104,"pt":105},"construction-housing","construcao-e-habitacao",{"en":107,"pt":108},"Construction & Housing","Construção e Habitação",{"slug":110,"name":113},{"en":111,"pt":112},"health-wellbeing","saude-e-bem-estar",{"en":114,"pt":115},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":117,"name":120},{"en":118,"pt":119},"community-social-innovation","comunidade-e-inovacao-social",{"en":121,"pt":122},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":124,"name":127},{"en":125,"pt":126},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":128,"pt":129},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":131,"name":134},{"en":132,"pt":133},"energy-water-mobility","energia-agua-e-mobilidade",{"en":135,"pt":136},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":138,"name":141},{"en":139,"pt":140},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":142,"pt":143},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":145,"name":148},{"en":146,"pt":147},"education-eco-tourism","educacao-e-ecoturismo",{"en":149,"pt":150},"Education & Eco-tourism","Educação e Ecoturismo","2026-07-04",[153],{"name":154,"slug":156,"active":25},{"en":155,"pt":22},"hydropower infrastructure","hydropower-infrastructure",[158,171,180],{"id":159,"slug":160,"region":69,"teaser":163,"category":166,"headline":167,"source_published_at":170},1788,{"en":161,"pt":162},"hydropower-concession-revenues-to-fund-serra-da-estrela","rendas-das-concessoes-hidroeletricas-vao-financiar-o",{"en":164,"pt":165},"Fourteen dams in a 89,000-hectare park come off concession in 2028, and the government wants the next owners to pay for the mountain's recovery.","Catorze aproveitamentos num parque de 89 mil hectares ficam sem concessão em 2028, e o Governo quer que os próximos concessionários paguem a recuperação da serra.","energy_water_mobility",{"en":168,"pt":169},"Hydropower concession revenues to fund Serra da Estrela ecological restoration","Rendas das concessões hidroelétricas vão financiar o restauro ecológico da Serra da Estrela","2026-10-30T00:00:00+00:00",{"id":172,"slug":173,"region":69,"teaser":22,"category":166,"headline":176,"source_published_at":179},1769,{"en":174,"pt":175},"cabril-dam-concession-tender-to-open-with-45-year-term-and","concurso-da-barragem-do-cabril-abre-com-concessao-a-45-anos",{"en":177,"pt":178},"Cabril Dam concession tender to open, with 45-year term and water reserve rules","Concurso da Barragem do Cabril abre com concessão a 45 anos e regras de reserva de água","2026-10-29T00:00:00+00:00",{"id":181,"slug":182,"region":69,"teaser":185,"category":21,"headline":188,"source_published_at":191},880,{"en":183,"pt":184},"coimbra-approves-1-36m-riverbank-renaturalisation-project","coimbra-aprova-projeto-de-renaturalizacao-da-margem-do-monde",{"en":186,"pt":187},"Coimbra's council signed off on a four-year plan covering 24 hectares of riverbank and hundreds of new trees.","A Câmara de Coimbra deu luz verde a um plano de quatro anos que abrange 24 hectares de margem e centenas de novas árvores.",{"en":189,"pt":190},"Coimbra approves €1.36m riverbank renaturalisation project","Coimbra aprova projeto de renaturalização da margem do Mondego de 1,36 milhões de euros","2026-09-21T00:00:00+00:00"]