[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-universidade-de-evora-lidera-projeto-de-nove-milhoes-para-te":3},{"page":4,"entities":44,"events":45,"regions":46,"categories":76,"pulseDate":133,"topics":134,"related":139},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1510,{"en":7,"pt":8},"evora-university-leads-9m-project-to-trial-green-hydrogen-in","universidade-de-evora-lidera-projeto-de-nove-milhoes-para-te",{"en":10,"pt":11},"Évora University leads €9m project to trial green hydrogen in Alentejo and Algarve","Universidade de Évora lidera projeto de nove milhões para testar hidrogénio verde no Alentejo e Algarve",{"en":13,"pt":14},"The University of Évora is coordinating H2tALENT, an international project meant to build a hydrogen valley in Alentejo and move green hydrogen from planning into real-world trials. Running from 2024 to 2030, it brings together 29 partners from seven countries and has a €9 million budget funded by the European Commission's Horizon programme. Production would centre on a 15-megawatt electrolyser plant in Sines. Demonstrations include converting municipal fleets in Alandroal, heating Évora's municipal pool with a hydrogen and natural gas blend, and a renewable energy community on Culatra island that stores surplus solar power as hydrogen. Output is projected at over 500 tonnes a year.","A Universidade de Évora coordena o H2tALENT, um projeto internacional que quer criar um \"vale do hidrogénio\" no Alentejo e passar do planeamento à demonstração no terreno. Decorre entre 2024 e 2030, reúne 29 parceiros de sete países e tem um orçamento de nove milhões de euros, financiado pelo programa Horizon da Comissão Europeia. A produção assenta numa unidade de eletrolisadores de 15 megawatts em Sines. Entre as demonstrações estão a conversão de frotas municipais no Alandroal, o aquecimento da piscina municipal de Évora com uma mistura de hidrogénio e gás natural e uma comunidade de energia renovável na ilha da Culatra, que armazena em hidrogénio o excedente solar. A meta é superar as 500 toneladas anuais.",{"en":16,"pt":17},"A municipal swimming pool in Évora and a small island off the Algarve coast are among the unlikely test sites for the technology.","Uma piscina municipal em Évora e uma pequena ilha do Algarve estão entre os improváveis campos de ensaio da tecnologia.","2026-10-13T00:00:00+00:00","2026-10-22T17:34:39.3291+00:00","alentejo","energy_water_mobility",null,[24,28,32,36,40],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fgreensavers.sapo.pt\u002Fprojeto-internacional-quer-testar-hidrogenio-renovavel-no-alentejo-e-algarve","Green Savers",{"is_primary":29,"source_url":30,"source_name":31,"published_at":18},false,"https:\u002F\u002Fjornalptgreen.pt\u002Fnoticia\u002Fprojeto-h2talent-quer-testar-hidrogenio-verde-no-alentejo-e-algarve","Jornal PT Green",{"is_primary":29,"source_url":33,"source_name":34,"published_at":35},"https:\u002F\u002Fpostal.pt\u002Fedicaopapel\u002Fculatra-vai-testar-hidrogenio-para-armazenar-energia-solar","Postal","2026-10-18T00:00:00+00:00",{"is_primary":29,"source_url":37,"source_name":38,"published_at":39},"https:\u002F\u002Fwww.radiopax.com\u002Funiversidade-de-evora-lidera-projeto-para-criar-um-vale-do-hidrogenio-no-alentejo","Rádio Pax","2026-10-15T00:00:00+00:00",{"is_primary":29,"source_url":41,"source_name":42,"published_at":43},"https:\u002F\u002Fwww.revistasustentavel.pt\u002Ftransicao-energetica\u002Fhidrogenio-renovavel-3","Revista Sustentável","2026-10-14T00:00:00+00:00",[],[],[47,51,55,60,63,67,72],{"code":48,"name":49},"norte",{"en":50,"pt":50},"Norte",{"code":52,"name":53},"centro",{"en":54,"pt":54},"Centro",{"code":56,"name":57},"lisboa",{"en":58,"pt":59},"Lisbon","Lisboa",{"code":20,"name":61},{"en":62,"pt":62},"Alentejo",{"code":64,"name":65},"algarve",{"en":66,"pt":66},"Algarve",{"code":68,"name":69},"azores",{"en":70,"pt":71},"Azores","Açores",{"code":73,"name":74},"madeira",{"en":75,"pt":75},"Madeira",[77,84,91,98,105,112,119,126],{"slug":78,"name":81},{"en":79,"pt":80},"food-agriculture","alimentacao-e-agricultura",{"en":82,"pt":83},"Food & Agriculture","Alimentação e Agricultura",{"slug":85,"name":88},{"en":86,"pt":87},"construction-housing","construcao-e-habitacao",{"en":89,"pt":90},"Construction & Housing","Construção e Habitação",{"slug":92,"name":95},{"en":93,"pt":94},"health-wellbeing","saude-e-bem-estar",{"en":96,"pt":97},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":99,"name":102},{"en":100,"pt":101},"community-social-innovation","comunidade-e-inovacao-social",{"en":103,"pt":104},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":106,"name":109},{"en":107,"pt":108},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":110,"pt":111},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":113,"name":116},{"en":114,"pt":115},"energy-water-mobility","energia-agua-e-mobilidade",{"en":117,"pt":118},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":120,"name":123},{"en":121,"pt":122},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":124,"pt":125},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":127,"name":130},{"en":128,"pt":129},"education-eco-tourism","educacao-e-ecoturismo",{"en":131,"pt":132},"Education & Eco-tourism","Educação e Ecoturismo","2026-10-14",[135],{"name":136,"slug":138,"active":25},{"en":137,"pt":22},"renewable gas","renewable-gas",[140,152,164],{"id":141,"slug":142,"region":20,"teaser":145,"category":21,"headline":148,"source_published_at":151},2106,{"en":143,"pt":144},"setubal-polytechnic-and-hylab-partner-on-green-hydrogen","politecnica-de-setubal-e-hylab-unem-se-para-investigar",{"en":146,"pt":147},"A residence not yet finished is already part of the plan, as students could soon be living in Sines to work alongside hydrogen researchers.","Uma residência ainda por concluir já faz parte do plano: os estudantes poderão em breve viver em Sines para trabalhar ao lado dos investigadores do hidrogénio.",{"en":149,"pt":150},"Setúbal Polytechnic and HyLab partner on green hydrogen research in Sines","Politécnica de Setúbal e HyLab unem-se para investigar hidrogénio verde em Sines","2026-11-23T00:00:00+00:00",{"id":153,"slug":154,"region":22,"teaser":157,"category":21,"headline":160,"source_published_at":163},2002,{"en":155,"pt":156},"lneg-maps-where-portugal-s-geology-could-favour-natural","lneg-mapeia-as-zonas-de-portugal-geologicamente-mais",{"en":158,"pt":159},"The region scoring best is also the one where the model is least certain, which shapes where researchers say the next work must go.","A região com melhor pontuação é também aquela onde o modelo revela maior incerteza, o que condiciona onde os investigadores querem agora concentrar o trabalho.",{"en":161,"pt":162},"LNEG maps where Portugal's geology could favour natural hydrogen, urging a national research programme","LNEG mapeia as zonas de Portugal geologicamente mais favoráveis ao hidrogénio natural e propõe programa nacional","2026-11-16T00:00:00+00:00",{"id":165,"slug":166,"region":22,"teaser":169,"category":21,"headline":172,"source_published_at":175},1888,{"en":167,"pt":168},"study-puts-numbers-on-portugal-s-biomethane-potential-and","estudo-quantifica-o-potencial-do-biometano-em-portugal-e-os",{"en":170,"pt":171},"Behind a €602 million climate benefit lies a stubborn paradox: the technology works, yet bio-waste collection reaches only 1 to 5% in most municipalities.","Por trás de um benefício climático de 602 milhões de euros está um paradoxo teimoso: a tecnologia existe, mas a recolha de biorresíduos fica entre 1 e 5% na maioria dos municípios.",{"en":173,"pt":174},"Study puts numbers on Portugal's biomethane potential and the barriers holding it back","Estudo quantifica o potencial do biometano em Portugal e os bloqueios que o travam","2026-11-06T00:00:00+00:00"]