[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-youdera-duplica-para-2-1-mwp-a-central-solar-que-abastece-a":3},{"page":4,"entities":33,"events":34,"regions":35,"categories":65,"pulseDate":122,"topics":123,"related":132},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":22,"news_page_sources":23},1982,{"en":7,"pt":8},"youdera-doubles-viana-do-castelo-solar-plant-serving","youdera-duplica-para-2-1-mwp-a-central-solar-que-abastece-a",{"en":10,"pt":11},"Youdera doubles Viana do Castelo solar plant serving Browning factory to 2.1 MWp","Youdera duplica para 2,1 MWp a central solar que abastece a fábrica da Browning em Viana do Castelo",{"en":13,"pt":14},"Youdera is finishing an expansion of the rooftop solar plant at Browning's industrial site in Viana do Castelo, doubling its capacity to about 2.1 MWp. The investment exceeds €1 million and should generate around 2.56 GWh of electricity a year, avoiding an estimated 566 tonnes of CO₂ annually. The power will be used on site, cutting the company's reliance on grid electricity and its exposure to price swings. The first phase went in during 2024, and this is now Youdera's largest solar installation in Portugal. A team of about 20 people has worked on the project since June 2026.","A Youdera está a concluir a expansão da central fotovoltaica instalada nas coberturas da unidade industrial da Browning, em Viana do Castelo, que passa a ter cerca de 2,1 MWp, o dobro da capacidade anterior. O investimento ultrapassa um milhão de euros e deverá render cerca de 2,56 GWh de eletricidade por ano, evitando a emissão estimada de 566 toneladas de CO₂ anuais. A energia será consumida na própria fábrica, o que reduz a dependência da rede e a exposição à volatilidade dos preços. A primeira fase foi concluída em 2024, e esta é agora a maior central solar da Youdera em Portugal. Cerca de 20 profissionais trabalham no projeto desde junho de 2026.",{"en":16,"pt":17},"A gun and fishing-gear maker's factory roofs are about to generate enough power to avoid 566 tonnes of CO₂ a year.","Os telhados de um fabricante de armas e artigos de pesca vão passar a produzir eletricidade suficiente para evitar 566 toneladas de CO₂ por ano.","2026-11-13T00:00:00+00:00","2026-11-16T02:37:29.337872+00:00","norte","energy_water_mobility",null,[24,28],{"is_primary":25,"source_url":26,"source_name":27,"published_at":18},true,"https:\u002F\u002Fwww.ambientemagazine.com\u002Fyoudera-duplica-capacidade-da-central-solar-da-browning-em-viana-do-castelo-para-21-mwp","Ambiente Magazine",{"is_primary":29,"source_url":30,"source_name":31,"published_at":32},false,"https:\u002F\u002Fwww.altominho.tv\u002Fsite\u002F2026\u002F11\u002F09\u002Ffabrica-da-browning-de-viana-amplia-central-fotovoltaica","Alto Minho","2026-11-09T00:00:00+00:00",[],[],[36,39,43,48,52,56,61],{"code":20,"name":37},{"en":38,"pt":38},"Norte",{"code":40,"name":41},"centro",{"en":42,"pt":42},"Centro",{"code":44,"name":45},"lisboa",{"en":46,"pt":47},"Lisbon","Lisboa",{"code":49,"name":50},"alentejo",{"en":51,"pt":51},"Alentejo",{"code":53,"name":54},"algarve",{"en":55,"pt":55},"Algarve",{"code":57,"name":58},"azores",{"en":59,"pt":60},"Azores","Açores",{"code":62,"name":63},"madeira",{"en":64,"pt":64},"Madeira",[66,73,80,87,94,101,108,115],{"slug":67,"name":70},{"en":68,"pt":69},"food-agriculture","alimentacao-e-agricultura",{"en":71,"pt":72},"Food & Agriculture","Alimentação e Agricultura",{"slug":74,"name":77},{"en":75,"pt":76},"construction-housing","construcao-e-habitacao",{"en":78,"pt":79},"Construction & Housing","Construção e Habitação",{"slug":81,"name":84},{"en":82,"pt":83},"health-wellbeing","saude-e-bem-estar",{"en":85,"pt":86},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":88,"name":91},{"en":89,"pt":90},"community-social-innovation","comunidade-e-inovacao-social",{"en":92,"pt":93},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":95,"name":98},{"en":96,"pt":97},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":99,"pt":100},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":102,"name":105},{"en":103,"pt":104},"energy-water-mobility","energia-agua-e-mobilidade",{"en":106,"pt":107},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":109,"name":112},{"en":110,"pt":111},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":113,"pt":114},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":116,"name":119},{"en":117,"pt":118},"education-eco-tourism","educacao-e-ecoturismo",{"en":120,"pt":121},"Education & Eco-tourism","Educação e Ecoturismo","2026-11-10",[124,128],{"name":125,"slug":127,"active":25},{"en":126,"pt":22},"solar power systems","solar-power-systems",{"name":129,"slug":131,"active":25},{"en":130,"pt":22},"energy self-consumption","energy-self-consumption",[133,145,157],{"id":134,"slug":135,"region":20,"teaser":138,"category":21,"headline":141,"source_published_at":144},1032,{"en":136,"pt":137},"alto-minho-water-utility-launches-tender-for-solar-self-cons-2","aguas-do-alto-minho-lanca-concurso-para-centrais-fotovoltaic-2",{"en":139,"pt":140},"Seven municipalities in the Alto Minho region are about to get solar plants funded through a near-374,000-euro contract.","Sete municípios do Alto Minho vão ganhar centrais fotovoltaicas através de um contrato de quase 374 mil euros.",{"en":142,"pt":143},"Alto Minho water utility launches tender for solar self-consumption plants","Águas do Alto Minho lança concurso para centrais fotovoltaicas de autoconsumo","2026-09-22T00:00:00+00:00",{"id":146,"slug":147,"region":22,"teaser":150,"category":21,"headline":153,"source_published_at":156},1017,{"en":148,"pt":149},"greenyellow-completes-18-solar-plants-for-jeronimo-martins-g-2","greenyellow-conclui-18-centrais-solares-para-o-grupo-jeronim-2",{"en":151,"pt":152},"Eighteen rooftop plants now power Pingo Doce and Recheio stores under a 15-year deal spanning locations from Albufeira to Sines.","Dezoito centrais em coberturas já alimentam lojas Pingo Doce e Recheio, num contrato de 15 anos que vai de Albufeira a Sines.",{"en":154,"pt":155},"GreenYellow completes 18 solar plants for Jerónimo Martins group","GreenYellow conclui 18 centrais solares para o grupo Jerónimo Martins","2026-09-10T00:00:00+00:00",{"id":158,"slug":159,"region":40,"teaser":162,"category":21,"headline":165,"source_published_at":168},366,{"en":160,"pt":161},"dstsolar-to-lead-7m-shared-solar-project-in-agueda","dstsolar-lidera-projeto-solar-coletivo-de-7-milhoes-em-agued",{"en":163,"pt":164},"Fifteen companies in Águeda will soon share power from the same local solar and battery network.","Quinze empresas em Águeda vão passar a partilhar energia da mesma rede solar e de baterias local.",{"en":166,"pt":167},"Dstsolar to lead €7m shared solar project in Águeda","Dstsolar lidera projeto solar coletivo de 7 milhões em Águeda","2026-09-04T00:00:00+00:00"]