[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-zero-diz-que-plano-do-litoral-ignora-defice-de-sedimentos-na":3},{"page":4,"entities":32,"events":52,"regions":53,"categories":84,"pulseDate":141,"topics":142,"related":151},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":20,"news_page_sources":22},511,{"en":7,"pt":8},"zero-says-coastal-plan-ignores-river-basin-sediment-loss","zero-diz-que-plano-do-litoral-ignora-defice-de-sedimentos-na",{"en":10,"pt":11},"ZERO says coastal plan ignores river-basin sediment loss","ZERO diz que plano do litoral ignora défice de sedimentos nas bacias",{"en":13,"pt":14},"Environmental association ZERO has analysed the Programa de Ação para a Resiliência do Litoral 2040, a €1.422 billion plan approved in July, and found it contains no measures upstream in river basins to restore sediment transport to the coast, despite acknowledging this is needed. Only €2.27 million (0.16% of the budget) goes to river-basin studies, while artificial beach nourishment accounts for €346 million. ZERO also criticises the plan's approval without public consultation, its silence on shared basins with Spain, and notes that around 82% of investment creates recurring maintenance obligations without a guaranteed multiannual funding line.","A associação ambientalista ZERO analisou o Programa de Ação para a Resiliência do Litoral 2040, um plano de 1422 milhões de euros aprovado em julho, e concluiu que não inclui qualquer medida a montante, nas bacias hidrográficas, para recuperar o transporte sedimentar até à costa, apesar de reconhecer essa necessidade. Apenas 2,27 milhões de euros (0,16% do investimento) são destinados a estudos sobre as bacias, enquanto a alimentação artificial de praias soma 346 milhões de euros. A ZERO critica ainda a aprovação sem consulta pública, a ausência de referência às bacias partilhadas com Espanha e o facto de cerca de 82% do investimento gerar encargos de manutenção recorrentes sem financiamento plurianual assegurado.",{"en":16,"pt":17},"Only 0.16% of a €1.4 billion coastal plan targets the rivers that supply sand to Portugal's beaches.","Apenas 0,16% de um plano de 1,4 mil milhões de euros para o litoral visa os rios que alimentam as praias portuguesas.","2026-08-19T00:00:00+00:00","2026-09-23T17:09:10.440763+00:00",null,"ecosystems_biodiversity",[23,27],{"is_primary":24,"source_url":25,"source_name":26,"published_at":18},true,"https:\u002F\u002Fzero.ong\u002Fnoticias\u002Fzero-alerta-que-faltam-medidas-nas-bacias-hidrograficas-para-travar-o-defice-de-sedimentos-no-litoral","ZERO",{"is_primary":28,"source_url":29,"source_name":30,"published_at":31},false,"https:\u002F\u002Fwww.ambientemagazine.com\u002Fzero-critica-programa-de-resiliencia-do-litoral-por-nao-prever-medidas-para-travar-defice-de-sedimentos","Ambiente Magazine","2026-08-20T00:00:00+00:00",[33],{"confidence":34,"project":35,"profile":20},0.99,{"name":36,"slug":37,"image":38,"summary":39,"is_published":24,"project_images":42},"ZERO – Associação Sistema Terrestre Sustentável","zero-associacao-sistema-terrestre-sustentavel","https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002FDia-Nacional-da-Agua-dois-anos-apos-o-fim-anunciado-do-caudal-zero-Tejo-continua-a-ter-dias-sem-agua.jpg",{"en":40,"pt":41},"ZERO is a Portuguese environmental NGO, founded in 2015, that advocates for sustainability on energy, pollution, waste, biodiversity and social equity.","A ZERO é uma ONG ambiental portuguesa, fundada em 2015, que defende a sustentabilidade nas áreas da energia, poluição, resíduos, biodiversidade e equidade social.",[43,44,46,48,50],{"image_url":38,"is_primary":24},{"image_url":45,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002Faterro-castelo-branco.jpg",{"image_url":47,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F08\u002FZERO-considera-a-construcao-de-um-incinerador-no-Algarve-como-gestao-danosa-para-o-interesse-publico.jpg",{"image_url":49,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F08\u002Fbarragem.jpg",{"image_url":51,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002FEstado-rios-e-aquiferos-em-Portugal-esta-a-piorar.jpg",[],[54,58,62,67,71,75,80],{"code":55,"name":56},"norte",{"en":57,"pt":57},"Norte",{"code":59,"name":60},"centro",{"en":61,"pt":61},"Centro",{"code":63,"name":64},"lisboa",{"en":65,"pt":66},"Lisbon","Lisboa",{"code":68,"name":69},"alentejo",{"en":70,"pt":70},"Alentejo",{"code":72,"name":73},"algarve",{"en":74,"pt":74},"Algarve",{"code":76,"name":77},"azores",{"en":78,"pt":79},"Azores","Açores",{"code":81,"name":82},"madeira",{"en":83,"pt":83},"Madeira",[85,92,99,106,113,120,127,134],{"slug":86,"name":89},{"en":87,"pt":88},"food-agriculture","alimentacao-e-agricultura",{"en":90,"pt":91},"Food & Agriculture","Alimentação e Agricultura",{"slug":93,"name":96},{"en":94,"pt":95},"construction-housing","construcao-e-habitacao",{"en":97,"pt":98},"Construction & Housing","Construção e Habitação",{"slug":100,"name":103},{"en":101,"pt":102},"health-wellbeing","saude-e-bem-estar",{"en":104,"pt":105},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":107,"name":110},{"en":108,"pt":109},"community-social-innovation","comunidade-e-inovacao-social",{"en":111,"pt":112},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":114,"name":117},{"en":115,"pt":116},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":118,"pt":119},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":121,"name":124},{"en":122,"pt":123},"energy-water-mobility","energia-agua-e-mobilidade",{"en":125,"pt":126},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":128,"name":131},{"en":129,"pt":130},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":132,"pt":133},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":135,"name":138},{"en":136,"pt":137},"education-eco-tourism","educacao-e-ecoturismo",{"en":139,"pt":140},"Education & Eco-tourism","Educação e Ecoturismo","2026-08-21",[143,147],{"name":144,"slug":146,"active":24},{"en":145,"pt":20},"coastal management","coastal-management",{"name":148,"slug":150,"active":24},{"en":149,"pt":20},"coastal resilience","coastal-resilience",[152,163,175],{"id":153,"slug":154,"region":20,"teaser":157,"category":21,"headline":160,"source_published_at":18},1137,{"en":155,"pt":156},"zero-says-coastal-plan-ignores-river-sediment-loss-at-source","zero-diz-que-plano-do-litoral-ignora-defice-de-sedimentos-na-2",{"en":158,"pt":159},"Only 0.16% of a €1.4 billion coastal plan targets the river basins where sediment loss actually begins.","Apenas 0,16% de um plano de 1,4 mil milhões de euros para o litoral visa as bacias onde começa o défice de sedimentos.",{"en":161,"pt":162},"ZERO says coastal plan ignores river sediment loss at source","ZERO diz que plano do litoral ignora défice de sedimentos na origem",{"id":164,"slug":165,"region":20,"teaser":168,"category":21,"headline":171,"source_published_at":174},1291,{"en":166,"pt":167},"portugal-pledges-75-million-for-ocean-observation-alliance","portugal-promete-75-milhoes-de-euros-para-alianca-de-observa",{"en":169,"pt":170},"The pledge was unveiled at a New York summit co-hosted by Ursula von der Leyen and Canada's Mark Carney.","O compromisso foi revelado numa cimeira em Nova Iorque copresidida por Ursula von der Leyen e o canadiano Mark Carney.",{"en":172,"pt":173},"Portugal pledges €75 million for ocean observation alliance","Portugal promete 75 milhões de euros para aliança de observação dos oceanos","2026-09-24T00:00:00+00:00",{"id":176,"slug":177,"region":72,"teaser":180,"category":21,"headline":183,"source_published_at":186},948,{"en":178,"pt":179},"portimao-clean-up-planned-for-joao-d-arens-forest-on-19-sept-3","limpeza-na-mata-de-joao-d-arens-marcada-para-19-de-setembro-3",{"en":181,"pt":182},"A morning clean-up in Portimão ties a coastal cause to a fire brigade's 100th anniversary.","Uma limpeza matinal em Portimão junta uma causa costeira ao centenário dos bombeiros locais.",{"en":184,"pt":185},"Portimão clean-up planned for João d'Arens forest on 19 September","Limpeza na Mata de João d'Arens marcada para 19 de setembro","2026-09-15T00:00:00+00:00"]