[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"news-pt-zero-propoe-por-300-mil-casas-em-uso-para-aliviar-a-crise-da":3},{"page":4,"entities":31,"events":51,"regions":52,"categories":83,"pulseDate":140,"topics":141,"related":150},{"id":5,"slug":6,"headline":9,"summary":12,"teaser":15,"source_published_at":18,"content_changed_at":19,"region":20,"category":21,"superseded_by":20,"news_page_sources":22},1969,{"en":7,"pt":8},"zero-urges-300-000-homes-be-brought-into-use-to-ease-housing","zero-propoe-por-300-mil-casas-em-uso-para-aliviar-a-crise-da",{"en":10,"pt":11},"ZERO urges 300,000 homes be brought into use to ease housing crisis","ZERO propõe pôr 300 mil casas em uso para aliviar a crise da habitação",{"en":13,"pt":14},"Environmental group ZERO wants 150,000 empty homes put on the market, 50,000 more renovated and 100,000 new public or cooperative homes built. It suggests siting many of them on public land within two kilometres of metro and train stations. It also calls for stricter use of the higher property tax on homes left vacant for no good reason, with the revenue paying for renovation work. It proposes prefabricated construction, and at least 20% of new homes for public employees. It estimates the renovation and building at €17 billion to €23.5 billion, and says protected land should be avoided.","A associação ambientalista ZERO quer 150 mil casas desocupadas colocadas no mercado, outras 50 mil recuperadas e 100 mil habitações novas, públicas ou cooperativas. Sugere localizar muitas delas em terrenos públicos a menos de dois quilómetros de estações de metro e comboio. Defende também uma aplicação mais eficaz do IMI agravado aos imóveis vazios sem justificação, com a receita a financiar obras de reabilitação. Propõe construção pré-fabricada e pelo menos 20% das novas casas para funcionários públicos. Estima o investimento entre 17 mil e 23,5 mil milhões de euros e exclui terrenos da Reserva Ecológica e da Reserva Agrícola.",{"en":16,"pt":17},"The plan puts a price tag of up to €23.5 billion on the housing push, and ties it to where the trains and metro already run.","O plano põe um preço de até 23,5 mil milhões de euros nesta aposta e liga-a às linhas de comboio e metro que já existem.","2026-11-13T00:00:00+00:00","2026-11-14T02:46:11.149165+00:00",null,"construction_housing",[23,27],{"is_primary":24,"source_url":25,"source_name":26,"published_at":18},true,"https:\u002F\u002Fwww.ambienteonline.pt\u002Fnoticias\u002Fzero-propoe-mobilizar-300-mil-casas-para-responder-a-crise-da-habitacao","Ambiente Online",{"is_primary":28,"source_url":29,"source_name":30,"published_at":18},false,"https:\u002F\u002Fzero.ong\u002Fnoticias\u002Fzero-propoe-300-mil-casas-acessiveis-e-eficientes-sem-agravar-a-dispersao-urbana-e-a-dependencia-automovel","ZERO",[32],{"confidence":33,"project":34,"profile":20},0.99,{"name":35,"slug":36,"image":37,"summary":38,"is_published":24,"project_images":41},"ZERO – Associação Sistema Terrestre Sustentável","zero-associacao-sistema-terrestre-sustentavel","https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002FDia-Nacional-da-Agua-dois-anos-apos-o-fim-anunciado-do-caudal-zero-Tejo-continua-a-ter-dias-sem-agua.jpg",{"en":39,"pt":40},"ZERO is a Portuguese environmental NGO, founded in 2015, that advocates for sustainability on energy, pollution, waste, biodiversity and social equity.","A ZERO é uma ONG ambiental portuguesa, fundada em 2015, que defende a sustentabilidade nas áreas da energia, poluição, resíduos, biodiversidade e equidade social.",[42,43,45,47,49],{"image_url":37,"is_primary":24},{"image_url":44,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002Faterro-castelo-branco.jpg",{"image_url":46,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F08\u002FZERO-considera-a-construcao-de-um-incinerador-no-Algarve-como-gestao-danosa-para-o-interesse-publico.jpg",{"image_url":48,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F08\u002Fbarragem.jpg",{"image_url":50,"is_primary":28},"https:\u002F\u002Fzero.ong\u002Fwp-content\u002Fuploads\u002F2026\u002F09\u002FEstado-rios-e-aquiferos-em-Portugal-esta-a-piorar.jpg",[],[53,57,61,66,70,74,79],{"code":54,"name":55},"norte",{"en":56,"pt":56},"Norte",{"code":58,"name":59},"centro",{"en":60,"pt":60},"Centro",{"code":62,"name":63},"lisboa",{"en":64,"pt":65},"Lisbon","Lisboa",{"code":67,"name":68},"alentejo",{"en":69,"pt":69},"Alentejo",{"code":71,"name":72},"algarve",{"en":73,"pt":73},"Algarve",{"code":75,"name":76},"azores",{"en":77,"pt":78},"Azores","Açores",{"code":80,"name":81},"madeira",{"en":82,"pt":82},"Madeira",[84,91,98,105,112,119,126,133],{"slug":85,"name":88},{"en":86,"pt":87},"food-agriculture","alimentacao-e-agricultura",{"en":89,"pt":90},"Food & Agriculture","Alimentação e Agricultura",{"slug":92,"name":95},{"en":93,"pt":94},"construction-housing","construcao-e-habitacao",{"en":96,"pt":97},"Construction & Housing","Construção e Habitação",{"slug":99,"name":102},{"en":100,"pt":101},"health-wellbeing","saude-e-bem-estar",{"en":103,"pt":104},"Health & Wellbeing","Saúde e Bem-Estar",{"slug":106,"name":109},{"en":107,"pt":108},"community-social-innovation","comunidade-e-inovacao-social",{"en":110,"pt":111},"Community & Social Innovation","Comunidade e Inovação Social",{"slug":113,"name":116},{"en":114,"pt":115},"ecosystems-biodiversity","ecossistemas-e-biodiversidade",{"en":117,"pt":118},"Ecosystems & Biodiversity","Ecossistemas e Biodiversidade",{"slug":120,"name":123},{"en":121,"pt":122},"energy-water-mobility","energia-agua-e-mobilidade",{"en":124,"pt":125},"Energy, Water & Mobility","Energia, Água e Mobilidade",{"slug":127,"name":130},{"en":128,"pt":129},"products-consumption-circular","produtos-consumo-e-economia-circular",{"en":131,"pt":132},"Products, Consumption & Circular","Produtos, Consumo e Economia Circular",{"slug":134,"name":137},{"en":135,"pt":136},"education-eco-tourism","educacao-e-ecoturismo",{"en":138,"pt":139},"Education & Eco-tourism","Educação e Ecoturismo","2026-11-14",[142,146],{"name":143,"slug":145,"active":24},{"en":144,"pt":20},"sustainable housing","sustainable-housing",{"name":147,"slug":149,"active":24},{"en":148,"pt":20},"public rail transport","public-rail-transport",[151,164,177],{"id":152,"slug":153,"region":67,"teaser":156,"category":159,"headline":160,"source_published_at":163},413,{"en":154,"pt":155},"zero-opposes-new-aljustrel-copper-mine-over-transport-and-wa","zero-opoe-se-a-nova-mina-de-cobre-em-aljustrel-por-transport",{"en":157,"pt":158},"An environmental group says a 250-million-euro copper mine could exhaust its waste storage capacity within years of opening.","Associação ambientalista avisa que instalação de resíduos de uma mina de 250 milhões de euros pode esgotar-se poucos anos depois de arrancar.","ecosystems_biodiversity",{"en":161,"pt":162},"ZERO opposes new Aljustrel copper mine over transport and waste","ZERO opõe-se a nova mina de cobre em Aljustrel por transporte e resíduos","2026-09-02T00:00:00+00:00",{"id":165,"slug":166,"region":54,"teaser":169,"category":172,"headline":173,"source_published_at":176},701,{"en":167,"pt":168},"porto-launches-free-public-transport-for-city-residents","porto-lanca-transportes-publicos-gratuitos-para-municipes-da",{"en":170,"pt":171},"Porto's mayor fulfils a campaign promise, and thousands of card updates now hinge on a trip to Andante or Payshop.","O presidente da câmara do Porto cumpre uma promessa de campanha, e milhares de atualizações de cartão dependem agora de uma ida à Andante ou Payshop.","energy_water_mobility",{"en":174,"pt":175},"Porto launches free public transport for city residents","Porto lança transportes públicos gratuitos para munícipes da cidade","2026-07-10T00:00:00+00:00",{"id":178,"slug":179,"region":62,"teaser":182,"category":172,"headline":185,"source_published_at":188},769,{"en":180,"pt":181},"lisbon-metro-to-pilot-5-30am-opening-from-october","metro-de-lisboa-vai-testar-abertura-as-5h30-a-partir-de-outu",{"en":183,"pt":184},"An environmental group's March complaint about workers left stranded before dawn has already reshaped Lisbon's transport plans.","Um pedido feito em março por uma associação ambientalista já está a mudar os planos de transporte de Lisboa.",{"en":186,"pt":187},"Lisbon Metro to pilot 5:30am opening from October","Metro de Lisboa vai testar abertura às 5h30 a partir de outubro","2026-06-24T00:00:00+00:00"]