Portugal grants land for ocean energy centre in Viana do Castelo
The Portuguese government authorised the transfer of surface rights over a 4,632 square-metre plot at Praia Norte, owned by the Polytechnic University of Viana do Castelo, to the local council for 30 years. The land will host a €5.1 million Technology and Innovation Centre in Ocean Energy, run by the Sustemare association, formalised in July and chaired by the university's rector. Construction will be funded by the Norte 2030 regional programme, with the council covering building and oversight costs before handing management to Sustemare. The centre aims to employ around 40 qualified professionals by 2030, focusing on blue energy and reducing the environmental impact of maritime infrastructure.
EU project to recover critical raw materials from EV batteries
CarMine, a European Horizon Europe project worth about €8.63 million, officially launched on 24 September in Vila Nova de Famalicão, coordinated by CeNTI. Running from September 2026 to August 2030, it aims to recover lithium, nickel, cobalt and rare earth elements from end-of-life electric vehicle batteries and motors, reprocessing them into materials comparable to virgin ones. The project involves 11 partner organisations covering dismantling, recycling, manufacturing and digital traceability, including a Digital Product Passport tracking recovered materials' origin. It seeks to cut waste, reduce environmental impact and lower Europe's dependence on external raw material supplies.
HyLab researcher outlines path for green hydrogen in Portugal
In an interview, Nuno Canha, Lead Researcher at HyLab, argues that Portugal's main challenge is coordinating hydrogen production, demand and infrastructure into an integrated, economically viable value chain, rather than proving the technology works. He says research can cut costs across storage, transport, distribution and safety, not just production, and highlights industrial and port hubs as key locations for concentrating producers, infrastructure and consumers. He also points to the Agenda H2 Green Valley project, which developed simulation tools, digital twins, sensors and experimental infrastructure covering blending, leak detection and end-use applications.
Carglass launches first renewable energy community at Viseu branch
Carglass Portugal has installed its first self-consumption solar unit at its Viseu-Coimbrões branch, a pilot project developed with SES Energia. The 24.36 kWp installation, with 42 panels, should generate about 32,670 kWh annually and could cover up to 65% of the branch's energy needs. Surplus electricity will be shared with nearby consumers, starting with local charity Os Amigos de Fragosela. Carglass says the model, framed under Decree-Law 15/2022 on energy communities, will be evaluated before any decision to replicate it at other branches, where it estimates potential capacity above 2 MW.
Dstelecom reports 99.91% renewable energy use in 2025
Telecoms operator dstelecom published its 2025 ESG Report ahead of Portugal's National Sustainability Day on 25 September. The company says 99.91% of the roughly 4,206 MWh it consumed came from renewable sources, backed by ISO 14001 certification and Science Based Targets initiative goals. Waste fell about 15% to 105.53 tonnes, with no hazardous waste recorded, alongside expanded refurbishment and circular procurement practices. The firm also reported 276 employees, up 12%, over 10,000 training hours, and new NP 4552 certification for work-life balance, plus continued fibre expansion in low-density areas.
Águas do Ribatejo to invest €6m upgrading three wastewater plants
Águas do Ribatejo has launched public tenders worth around €6 million to overhaul three ageing wastewater treatment plants at Benfica do Ribatejo, Muge and Glória do Ribatejo. Company director-general Miguel Carrinho said the decades-old facilities need deep renovation to meet current and upcoming environmental standards, including the new EU urban wastewater directive. Work is expected to take between roughly eighteen months and just over two years, depending on the project. The plants serve part of the 140,000 people covered by the company across seven municipalities in the Lezíria do Tejo, and the projects have applied for EU funding under the Sustentável 2030 programme.